[Amended 2-5-1987 by Ord. No. 87-6]
A.
Unless otherwise provided for in these regulations and requirements under § 303-7 or 303-8, the applicant shall deposit with the Clerk prior to the start of construction a minimum sum as provided in Chapter 182, Fees, with each application for such opening permit, plus cost of engineering fees plus an additional sum of 10% of the estimated cost of the improvement or opening as filed under § 303-5 above.
B.
The moneys so filed shall be used to pay the costs of engineering, inspection, legal services, unrepaired damages or other legitimate costs to the Township of Franklin assignable directly to the project. Within two months after completion and final approval of the project or opening, which also means two months after the expiration of the eighteen-month maintenance period specified in § 303-34 below, all unexpended moneys remaining shall be returned to the applicant, except for an additional amount as provided in Chapter 182, Fees, which shall be retained by the Township of Franklin as its final application fee.