[Amended 7-10-1997 by Ord. No. 97-08; 8-14-1997 by Ord. No. 97-09; 2-24-2000 by Ord. No. 00-01; 12-14-2000 by Ord. No. 00-06; 6-10-2004 by Ord. No. 2004-04; 4-12-2007 by Ord. No. 2007-01; 8-9-2007 by Ord. No. 2007-03; 8-14-2014 by Ord. No. 2014-07; 2-14-2019 by Ord. No. 2019-01; 10-10-2019 by Ord. No. 2019-04; 12-31-2020 by Ord. No. 2020-03; 8-12-2021 by Ord. No. 2021-07; 12-8-2022 by Ord. No. 2022-03; 8-10-2023 by Ord. No. 2023-06; 2-8-2024 by Ord. No. 2024-01; 7-10-2025 by Ord. No. 2025-04]
A.
The following schedule of fees is hereby established with respect to licenses, permits and activities required or regulated under the provisions of various chapters of the Code of the Town of Rock Hall. Applications for and the issuance of such licenses and permits shall be subject to the provisions of the specific chapter of the Code which is indicated for each type of license or permit. The businesses, activity or operation for which the license or permit is required shall be subject to all regulations set forth in the chapter to which reference is made.
(1)
Chapter 81, Building Construction.
(a)
Building and zoning permit fees, costs and charges:
[1]
Building permit fees:
[a]
Filing fee (for all projects requiring a building permit): $45.
[b]
Permit fees:
Type of Construction | Rate (per square foot) |
|---|---|
Garage, pole buildings, sheds over 200 square feet | $0.50 |
Unenclosed porches and decks (including above first flood) | $0.45 |
Livable/usable space | |
Basement, unfinished | $0.20 |
Finished, up to 2,500 square feet | $0.40 |
Finished, over 2,500 square feet | $1.10 |
Extra (morning/sunroom, enclosed porch, balconies, etc.) | $0.50 |
[2]
Zoning permit fees:
[b]
Major project zoning permits:
[i]
Solar array: $100.
[ii]
Critical area lot coverage (e.g., patios and walkways): $100.
[iii]
Piers: $100.
[iv]
Pole buildings, garage: $100.
[v]
Pole buildings, garage in the critical area: $150.
[vi]
Residential additions and structural alterations: $100.
[vii]
New residential building, site development: $200.
[viii]
New residential building, site development in the critical area: $250.
[ix]
Nonresidential addition, structural alterations: $100.
[x]
New nonresidential building, site development: $300.
[xi]
New nonresidential building, site development in the critical area: $350.
[xii]
Other site improvements: $200.
[xiii]
Other site improvements in the critical area: $250.
[c]
Special zoning permits:
[i]
Use permit (required when changing the use of a building or site): $50.
[ii]
Demolition permit, single-family residential site: $50.
[iii]
Demolition permit, other uses: $100.
[iv]
Certificate of occupancy, residential per dwelling unit: $75.
[v]
Certificate of occupancy, nonresidential, under 2,500 square feet: $200.
[vi]
Certificate of occupancy, nonresidential, 2,250 to 20,000 square feet: $300.
[vii]
Certificate of occupancy, nonresidential, over 20,000 square feet: $500.
(c)
Stormwater management fees, costs and charges:
[1]
Filing fee: $250.
[2]
Concept plan review: $1,200.
[3]
Preliminary plan review: $2,000.
[4]
Final plan review: $1,200.
[5]
Combination plan review fee (allowed for projects with less than 15% lot coverage): $2,000.
[6]
Stormwater management plan as-built certification: $250.
[7]
Cost of inspection: To be billed separately to developer.
(3)
Chapter 125, Garbage, Rubbish and Waste.
(b)
Bulk trash collection fees:
[1]
Per stop: $10;
[2]
Plus white good with fluorocarbon, per item (refrigerators, freezers, air conditioners and water coolers): $15;
[3]
Plus other white good, per item: $10;
[4]
Plus furniture, mattress or box spring, per item: $5;
[5]
Plus tires:
[a]
Passenger tire (< R-15), per tire: $3.
[b]
Passenger and light truck (> R-15), per tire: $5.
[c]
Heavy-duty truck, per tire: $8.
[d]
Over the road tire, prorated to the pound: $400 per ton.
[e]
Tires with water or other foreign matter (mud, polyfill, etc.) and tires on rims will be accepted at twice the regular charge.
(5)
Chapter 167, Plumbing.
(a)
Plumbing fixtures, up to five fixtures: $15.
(b)
Extra plumbing fixtures, over five installed on same permit: $4 each.
(c)
Appliances: $7.50 each.
(e)
Fire sprinkler, standpipes, lawn sprinkler systems (Construction value shall be based on "Means Construction Cost Index," current edition, as published by McGraw-Hill, Inc.):
[1]
First $1,000 and each additional $1,000 or fraction thereof: $6.50.
(h)
Multiple connections: An application for five or more water connections and/or five or more sewer connections shall be entitled to a discount of ten percent (10%) on the total amount of the connection charges provided that the charges are paid in one lump sum.
(i)
Multiple dwellings, per unit: $1,000. Multiple dwellings are those dwellings that have one meter but individual dwelling units, such as apartments, hotels, motels, approved mobile home parks and travel trailer campgrounds.
(6)
Chapter 184, Sewers.
(a)
The sewer charge will be two times that of the water charge, effective July 1, 1994.
(b)
The following application fees for the purchase of sewer allocations are adopted as follows:
[2]
Subdivision:
[a]
Residential, per dwelling unit: $400.
[b]
Detached, single-family dwelling (fill-in-lots), per unit: $200.
[c]
Group homes/domiciliary care homes, per lodging unit: $400.
[d]
Bed-and-breakfast facilities, per sleeping room: $200.
[e]
Any nonresidential entity not listed above, per gallon of allocation required: $0.75.
(c)
Sewer impact fee: $2,000.
(d)
All other current sewer rates and charges are on file in the office of the Town Clerk.
(10)
Chapter 220, Water.
(a)
In-town water rates, effective July 1, 2025:
Number of Gallons Used per Quarter | Quarterly Fee |
|---|---|
First 12,000 | See meter size in § 102-1A(10)(b) for quarterly fee amount. |
Over 12,000, per 1,000 gallons | $6.52 |
(b)
Charge for water by measurement: minimum quarterly charge, per meter (effective July 1, 2025):
Meter Size (inches) | Quarterly Fee |
|---|---|
3/4 | $65.11 |
1 | $65.11 |
1 1/2 | $130.21 |
2 | $195.32 |
3 | $260.44 |
4 | $390.65 |
6 | $651.08 |
(d)
Fee for reading meters due to transfer/settlement of properties: $20.
(f)
Fee for reading meters in addition to primary meters: $20.
B.
Zoning fees.
(2)
Site plans:
(d)
Preliminary site plan review: Single-family, residential accessory buildings over 650 square feet: $1,200.
(e)
Preliminary site plan review: Residential site plans under 10 dwelling units: $2,400.
(f)
Preliminary plan review: Residential site plans 10 or more dwelling units $4,800.
(h)
Amendments to site plan: $500.
(i)
Extensions of approved site plan: $500.
[1]
Editor's Note: Copies of the Fee Schedule are available in the Town offices. Check with the Town office for any changes in fees as this chapter will only be updated annually.