[Amended 7-24-1985]
Plans and specifications for construction of sanitary sewerage systems by developers or other persons shall be submitted to the Borough, the Borough Board of Public Works and the SCMUA for approval. Said plans and specifications shall be prepared by a licensed professional engineer (signed and sealed), and shall conform with all requirements of the NJDEP for the design and construction of sanitary sewerage systems. All new sewers shall be properly designed and constructed in order to avoid the creation of infiltration and inflow sources within the sanitation sewer system.
[Amended 7-24-1985]
Approval by the Borough for construction of said sanitary sewerage systems shall not be provided until the following are obtained:
A. 
Approval by Borough Planning Board.
B. 
Approval by Borough Engineer.
C. 
Approval by SCMUA.
D. 
Receipt of NJDEP construction permit (if applicable).
E. 
Required maintenance and/or other bonds, as required by the Borough.
F. 
Approval by Hamburg Board of Public Works.
In the event construction conditions require field changes, a written request for approval of such changes, stating reasons for such changes, must first be submitted to, and approved in writing by, the Borough and SCMUA.
Said new sewer system shall be operated and maintained by the developer in accordance with good practice, until ownership of the new sewer system is conveyed to the Borough, at which time operation and maintenance shall be performed by the Borough. Ownership of the new sewer system shall be conveyed to the Borough after 24 months of operation of the new system.