A.
No person shall do any excavating, test drilling or disturb any public street or road surface or curbing or sidewalks within the right-of-way of any street or road in the borough, including all sidewalks, streets and roads in private developments not a part of the borough street system at the time of excavation, but where it is contemplated that application will subsequently be made to have the streets or roads become a part of the borough road system for the purpose of laying, changing, repairing or connecting any water, gas, sewer pipe, storm drain or any electric, telephone or telegraph pipes or conduits, or for any other purpose whatever without first having obtained a permit from the Borough Clerk.
B.
It shall be unlawful for any person to make a tunnel, opening or excavation of any kind in or under the surface of any street without first securing a permit from the borough for each separate undertaking.
C.
Any person maintaining pipes, lines or other underground facilities in or under the surface of any street may proceed with an opening without a permit when emergency circumstances demand the work to be done immediately, provided the permit could not reasonably and practically have been obtained beforehand. The person shall thereafter apply for a permit on the first regular business day of which the office of the Borough Clerk is open for business, and the permit shall be retroactive to the date when the work was begun.
D.
The acceptance of any permit under this article shall constitute an agreement with the Borough of Hamburg providing that the applicant agrees to save the borough, its officers, employees and agents harmless for any and all costs, damages and liabilities which may accrue or be claimed to accrue by reason of any work performed under the permit.