Before recording of final subdivision plats or deeds and/or as a condition of final site plan approval and/or as a condition to the issuance of a zoning permit, the applicant shall have installed all required improvements; provided, however, that the Township agency may require and shall accept performance and maintenance guarantees for the purpose of assuring the installation and maintenance of certain on tract improvements. Such performance and maintenance guarantees shall be in accordance with the provisions of this article. In the event that final approval is by stages or sections of development as provided by this chapter, the provisions of this article shall be applied by stage or section of development. The nature and scope of required performance guarantees shall be as follows:
A.
Public improvements. Performance guarantees shall be provided for those improvements required by an approval or developer's agreement, ordinance, or regulation to be dedicated to a public entity, and that have not yet been installed for the following improvements as shown on the approved plans or plat: streets, pavement, gutters, curbs, sidewalks, street lighting, street trees, surveyor's monuments, as shown on the final map and required by the Map Filing Law, P.L. 1960, c. 141 (N.J.S.A. 46:23-9.9 et seq.; repealed by Section 2 of P.L. 2011, c. 217) or N.J.S.A. 46:26B-1 through N.J.S.A. 46:26B-8, water mains, sanitary sewers, community septic systems, drainage structures, public improvements of open space, and any grading necessitated by the preceding improvements.
B.
Perimeter buffers. Performance guarantees shall be provided, within an approved phase or section of a development, privately owned perimeter buffer landscaping, as required by this chapter or imposed as a condition of approval.
C.
Safety and stabilization. A safety and stabilization guarantee, in favor of the Township, shall be provided, when required by the approving agency, for the purpose of returning property that has been disturbed to a safe and stable condition or otherwise implementing measures to protect the public from access to an unsafe or unstable condition.
D.
Temporary certificates of occupancy. In the event that the developer shall seek a temporary certificate of occupancy for a development, unit, lot, building, or phase of development, as a condition of the issuance thereof, the developer shall furnish a separate guarantee, referred to herein as a "temporary certificate of occupancy guarantee." Such guarantee shall cover the cost of installation of only those improvements or items which remain to be completed or installed under the terms of the temporary certificate of occupancy and which are required to be installed or completed as a condition precedent to the issuance of the permanent certificate of occupancy for the development, unit, lot, building or phase of development and which are not covered by an existing performance guarantee. The scope and amount of the temporary certificate of occupancy guarantee shall be determined by the Township Engineer.
E.
Successor developer. In the event that a successor developer to the original developer becomes responsible for completion of the required improvements, the successor developer shall furnish a replacement performance guarantee.