It shall be the duty of the Advisory Board to advise the Township Council
and administration on the feasibility and the method of sewering the Lake
Hopatcong Watershed Section of the Musconetcong River Drainage Basin within
the Township of Jefferson, as described in the Wastewater Management Plan.
The Board may consult with the Township Engineer and any consultants necessary
hired by the Township.
The Board shall meet as it deems necessary and shall file semiannual
reports with the Mayor and Township Council. The Board may file more frequent
reports as may be deemed necessary by the Board.