[Amended 9-15-1987 by Ord. No. 1987-13; 3-2-2022 by Ord. No. 2022-4]
A.
Unless authorized by the Township Committee as set forth in Subsection B, below, no construction of site improvements, including clearing, grading, drainage or other improvements for any application for development approved by the Township, shall be permitted until all outside agency approvals for the development are obtained.
B.
A majority of the Township Committee may grant an exemption and authorize the initial construction of site improvements, including clearing, grading, drainage or other improvements (but not construction permits issued by the Construction Code Official) based on a written request by a developer, setting forth the improvements proposed to be constructed, the status of any remaining outside agency approvals and any hardship claim by the developer to justify the granting of an exemption by the Township Committee.
C.
If a majority of the Township Committee agrees to provide an exemption hereunder, no construction can take place unless and until all of the following conditions are satisfied.
(1)
The developer submits a hold harmless letter in the form provided by the Township Attorney indemnifying the Township from any liability for the construction of improvements prior to the receipt of all required outside agency approvals.
(2)
The developer post the required inspection escrows to pay for the inspection of the improvements that are authorized by the Township Engineer.
(4)
The developer completes a preconstruction conference with the Township Engineer.