Prior to the granting of final approval, the subdivider shall have installed or shall have furnished performance guaranties for the ultimate installation of the following on-tract improvements:
A.
Streets.
B.
Street signs.
C.
Curbs, gutters or both.
D.
Sidewalks.
E.
Streetlighting.
F.
Shade trees of such type, location, size and number as specified by the Shade Tree Commission of the Borough of Maywood.
G.
Topsoil protection. No topsoil shall be removed from the site or used in accordance with the provisions of Ordinance No. 16-85 relating to soil removal and deposit as spoil.[1] Topsoil moved during the course of construction shall be redistributed so as to provide at least six inches of cover to all areas of the subdivision and shall be stabilized by seeding or planting.
H.
Monuments, to be of the size and shape required by Chapter 141 of the Laws of 1960, N.J.S.A. 46:23-9.11, and to be placed in accordance with said statute.
I.
Water mains, culverts, storm sewers and sanitary sewers.