Exciting enhancements are coming soon to eCode360! Learn more 🡪
City of Lackawanna, NY
Erie County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Added 2-5-2008]
A. 
Findings. It is hereby determined that:
(1) 
Land development activities and associated increases in site impervious cover often alter the hydrologic response of local watersheds and increase stormwater runoff rates and volumes, flooding, stream channel erosion, or sediment transport and deposition;
(2) 
This stormwater runoff contributes to increased quantities of waterborne pollutants, including siltation of aquatic habitat for fish and other desirable species;
(3) 
Clearing and grading during construction tends to increase soil erosion and add to the loss of native vegetation necessary for terrestrial and aquatic habitat;
(4) 
Improper design and construction of stormwater management practices can increase the velocity of stormwater runoff, thereby increasing streambank erosion and sedimentation;
(5) 
Impervious surfaces allow less water to percolate into the soil, thereby decreasing groundwater recharge and stream baseflow;
(6) 
Substantial economic losses can result from these adverse impacts on the waters of the City;
(7) 
Stormwater runoff, soil erosion and nonpoint source pollution can be controlled and minimized through the regulation of stormwater runoff from land development activities;
(8) 
The regulation of stormwater runoff discharges from land development activities in order to control and minimize increases in stormwater runoff rates and volumes, soil erosion, stream channel erosion, and nonpoint source pollution associated with stormwater runoff is in the public interest and will minimize threats to public health and safety; and
(9) 
Regulation of land development activities by means of performance standards governing stormwater management and site design will produce development compatible with the natural functions of a particular site or an entire watershed and thereby mitigate the adverse effects of erosion and sedimentation from development.
B. 
Purpose. The purpose of this article is to establish minimum stormwater management requirements and controls to protect and safeguard the general health, safety, and welfare of the public residing within this jurisdiction and to address the findings of fact in § 230-90A of this article. This article seeks to meet those purposes by achieving the following objectives:
(1) 
Meet the requirements of minimum measures 4 and 5 of the SPDES General Permit for Stormwater Discharges From Municipal Separate Storm Sewer Systems (MS4s), Permit No. GP-02-02, or as amended or revised;
(2) 
Require land development activities to conform to the substantive requirements of the SPDES General Permit for Stormwater Discharges From Construction Activity, Permit No. GP-02-01, or as amended or revised;
(3) 
Minimize increases in stormwater runoff from land development activities in order to reduce flooding, siltation, increases in stream temperature, and streambank erosion and maintain the integrity of stream channels;
(4) 
Minimize increases in pollution caused by stormwater runoff from land development activities which would otherwise degrade local water quality;
(5) 
Minimize the total annual volume of stormwater runoff which flows from any specific site during and following development to the maximum extent practicable; and
(6) 
Reduce stormwater runoff rates and volumes, soil erosion and nonpoint source pollution, wherever possible, through stormwater management practices and ensure that these management practices are properly maintained and eliminate threats to public safety.
As used in this article, the following terms shall have the meanings indicated:
AGRICULTURAL ACTIVITY
The activity of an active farm including grazing and watering livestock, irrigating crops, harvesting crops, using land for growing agricultural products, and cutting timber for sale, but shall not include the operation of a dude ranch or similar operation, or the construction of new structures associated with agricultural activities.
APPLICANT
A property owner or agent of a property owner who has filed an application for a land development activity.
BUILDING
Any structure, either temporary or permanent, having walls and a roof, designed for the shelter of any person, animal or property, and occupying more than 100 square feet of area.
CHANNEL
A natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water.
CLEARING
Any activity that removes the vegetative surface cover.
DEC
The New York State Department of Environmental Conservation.
DEDICATION
The deliberate appropriation of property by its owner for general public use.
DESIGN MANUAL
The New York State Stormwater Management Design Manual (New York State Department of Environmental Conservation), most recent version or its successor, including applicable updates, which serves as the official guide for stormwater management principles, methods and practices.
DEVELOPER
A person who undertakes land development activities.
EROSION CONTROL MANUAL
The New York Standards and Specifications for Erosion and Sediment Control (Empire State Chapter of the Soil and Water Conservation Society, 2004), most current version or its successor, commonly known as the "Blue Book."
GRADING
Excavation or fill of material, including the resulting conditions thereof.
IMPERVIOUS COVER
Those surfaces, improvements and structures that cannot effectively infiltrate rainfall, snowmelt and water (e.g., building rooftops, pavement, sidewalks, driveways, etc.).
INDUSTRIAL STORMWATER PERMIT
A State Pollutant Discharge Elimination System (SPDES) permit issued to a commercial industry or group of industries which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies.
INFILTRATION
The process of percolating stormwater into the subsoil.
JURISDICTIONAL WETLAND
An area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted for life in saturated soil conditions, commonly known as "hydrophytic vegetation."
LAND DEVELOPMENT ACTIVITY
Construction activity including clearing, grading, excavating, soil disturbance or placement of fill that results in land disturbance of equal to or greater than one acre, or activities disturbing less than one acre of total land area that is part of a larger common plan of development or sale disturbing one acre or more in the aggregate, even though multiple separate and distinct land development activities may take place at different times on different schedules.
LANDOWNER
The legal or beneficial owner of land, including those holding the right to purchase or lease the land, or any other person holding proprietary rights in the land.
LICENSED PROFESSIONAL
A professional engineer or landscape architect licensed to practice his or her profession in New York State.
MAINTENANCE AGREEMENT
A legally recorded document that acts as a property deed restriction, and which provides for long-term maintenance of stormwater management practices.
NONPOINT SOURCE POLLUTION
Pollution from any source other than from any discernible, confined, and discrete conveyances, and shall include, but not be limited to, pollutants from agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources.
PHASING
Clearing a parcel of land in distinct pieces or parts, with the stabilization of each piece completed before the clearing of the next.
POLLUTANT OF CONCERN
Sediment or a water quality measurement that addresses sediment (such as total suspended solids, turbidity or siltation) and any other pollutant that has been identified as a cause of impairment of any water body that will receive a discharge from the land development activity.
PROJECT
Land development activity.
RECHARGE
The replenishment of underground water reserves.
SEDIMENT CONTROL
Measures that prevent eroded sediment from leaving the site.
SENSITIVE AREAS
Coldwater fisheries, shellfish beds, swimming beaches, groundwater recharge areas, water supply reservoirs, or habitats for threatened, endangered or special concern species.
SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITY, PERMIT NO. GP-02-01
A permit under the New York State Pollutant Discharge Elimination System (SPDES) issued to developers of construction activities to regulate disturbance of one or more acres of land.
SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS GP-02-02
A permit under the New York State Pollutant Discharge Elimination System (SPDES) issued to municipalities to regulate discharges from municipal separate storm sewers for compliance with EPA established water quality standards and/or to specify stormwater control standards.
STABILIZATION
The use of practices that prevent exposed soil from eroding.
STOP-WORK ORDER
An order issued which requires that all construction activity on a site be stopped.
STORMWATER
Rainwater, surface runoff, snowmelt and drainage.
STORMWATER MANAGEMENT
The use of structural or nonstructural practices that are designed to reduce stormwater runoff and mitigate its adverse impacts on property, natural resources and the environment.
STORMWATER MANAGEMENT FACILITY
One or a series of stormwater management practices installed, stabilized and operating for the purpose of controlling stormwater runoff.
STORMWATER MANAGEMENT OFFICER (SMO)
An employee or officer of the City of Lackawanna designated by the City Council to accept and review stormwater pollution prevention plans (SWPPPs), forward the plans to such employee, officer or board of the City of Lackawanna which may be reviewing any application for a construction activity requiring submission of a SWPPP, and inspect stormwater management practices.
STORMWATER MANAGEMENT PRACTICES (SMPs)
Measures, either structural or nonstructural, that are determined to be the most effective, practical means of preventing flood damage and preventing or reducing point source or nonpoint source pollution inputs to stormwater runoff and water bodies.
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
A plan for controlling stormwater runoff and pollutants from a site during and after construction activities.
STORMWATER RUNOFF
Flow on the surface of the ground resulting from precipitation.
SURFACE WATERS OF THE STATE OF NEW YORK
Lakes, bays, sounds, ponds, impounding reservoirs, springs, wells, rivers, streams, creeks, estuaries, marshes, inlets, canals, the Atlantic Ocean within the territorial seas of the State of New York and all other bodies of surface water, natural or artificial, inland or coastal, fresh or salt, public or private (except those private waters that do not combine or effect a junction with natural surface or underground waters), which are wholly or partially within or bordering the state or within its jurisdiction. Storm sewers and waste treatment systems, including treatment ponds or lagoons which also meet the criteria of this definition, are not waters of the state. This exclusion applies only to man-made bodies of water which neither were originally created in waters of the state (such as a disposal area in wetlands) nor resulted from impoundment of waters of the state.
WATERCOURSE
A permanent or intermittent stream or other body of water, either natural or man-made, which gathers or carries surface water.
WATERWAY
A channel that directs surface runoff to a watercourse or to the public storm drain.
A. 
Applicability. This article shall be applicable to all land development activities within the City.
B. 
Exemptions. The following activities shall be exempt from review under this article:
(1) 
Agricultural activity;
(2) 
Silvicultural activity, except that landing areas and log haul roads are subject to this article;
(3) 
Routine maintenance activities that disturb less than five acres and are performed to maintain the original line and grade, hydraulic capacity or original purpose of a facility;
(4) 
Repairs to any stormwater management practice or facility deemed necessary by the SMO;
(5) 
Land development activities for which a building permit has been approved on or before the effective date of this article;
(6) 
Cemetery graves;
(7) 
Installation of fence, sign, telephone, and electric poles and other kinds of posts or poles;
(8) 
Emergency activity immediately necessary to protect life, property or natural resources;
(9) 
Activities of an individual engaging in home gardening by growing flowers, vegetables or other plants primarily for use by that person and his or her family; and
(10) 
Landscaping and horticultural activities in connection with an existing structure.
C. 
Conflict. Where the conditions imposed by any provisions of this article are either more restrictive or less restrictive than comparable conditions imposed by any other applicable law, ordinance, resolution, rule or regulation of any kind, the regulations which are more restrictive and impose higher standards or requirements shall govern.
A. 
The City shall designate an SMO who shall accept and review all SWPPPs. The SMO may.
(1) 
Review the SWPPPs;
(2) 
Upon approval by the City Council, engage the services of a registered professional engineer to review the SWPPPs, specifications and related documents at a cost not to exceed a fee schedule established by the City Council; or
(3) 
Accept the certification of a licensed professional that the SWPPPs conform to the requirements of this article.
B. 
For all land development activities subject to review and approval by the Zoning Officer or Planning and Development Board under mobile home or site plan regulations, the applicant or developer shall be required to submit a SWPPP that complies with the requirements of this article to the SMO, and the land development activity shall be reviewed subject to the standards contained in this article.
(1) 
Review by SMO. Within 60 days of receipt of a SWPPP, the SMO shall forward the SWPPP, together with his or her written recommendation to approve, approve with modifications, or disapprove the SWPPP, to the employee, officer, or board of the City which is reviewing an application for approval of a land development activity requiring submission of a SWPPP. A recommendation of approval shall only be given if the SWPPP complies with the requirements of this article. In making a recommendation to approve with modifications or disapprove the SWPPP, the SMO shall state the reasons for the decision in writing.
(2) 
Review by final reviewing body. The employee, officer or board of the City reviewing the application for approval of a land development activity shall review the SWPPP and recommendation of the SMO and shall act to approve, approve with modifications, or disapprove the SWPPP. Such reviewing body shall not act to approve the SWPPP unless it complies with the requirements of this article. If the reviewing body acts to approve with modifications or disapprove the SWPPP, the reasons for the decision shall be stated in writing. In order to be approved, the applicant shall revise a SWPPP that has been approved with modifications or disapproved in accordance with the recommendations of the reviewing body and shall submit the revised SWPPP to such body for review.
C. 
For all land development activities not subject to review by the Zoning Officer or Planning and Development Board as stated in § 230-93B of this article, the applicant or developer shall be required to submit a SWPPP prepared in accordance with the standards contained in this article to the SMO, and such SWPPP must be approved prior to commencement of the land development activity. Within 60 days of receipt of a SWPPP, the SMO shall approve, approve with modifications, or disapprove the SWPPP. Approval shall only be given if the SWPPP complies with the requirements of this article. In approving with modifications or disapproving the SWPPP, the SMO shall state the reasons for the decision in writing. In order to be approved, an applicant shall revise a SWPPP that has been approved with modifications or disapproved in accordance with the recommendations of the SMO and shall submit the revised SWPPP to the SMO for review.
A. 
Stormwater pollution prevention plan requirement. No application for approval of a land development activity shall be reviewed and no land development activity shall be commenced until the SMO or such employee, officer or board of the City which may be reviewing an application for approval of a land development activity requiring submission of a SWPPP has received a SWPPP the complies with the specifications in this article and has approved such SWPPP.
B. 
Contents of stormwater pollution prevention plans.
(1) 
All SWPPPs shall provide the following background information and erosion and sediment controls:
(a) 
Background information about the scope of the project, including the location, type and size of the project;
(b) 
Site map/construction drawing(s) for the project, including a general location map. The site map should be at a scale of no smaller than one inch to 100 feet. At a minimum, the site map should show the total site area; all improvements; areas of disturbance; areas that will not be disturbed; existing vegetation; on-site and adjacent off-site surface water(s); wetlands and drainage patterns that could be affected by the land development activity; existing and final slopes; locations of off-site material, waste, borrow or equipment storage areas; and location(s) of the stormwater discharges(s);
(c) 
Description of the soil(s) present at the site;
(d) 
Construction phasing plan describing the intended sequence of construction activities, including clearing and grubbing, excavation and grading, utility and infrastructure installation and any other activity at the site that results in soil disturbance. Consistent with the Erosion Control Manual, not more than five acres shall be disturbed at any one time unless pursuant to an approved SWPPP;
(e) 
Description of the pollution prevention measures that will be used to control litter, construction chemicals and construction debris from becoming a pollutant source in stormwater runoff;
(f) 
Description of construction and waste materials expected to be stored on site with updates as appropriate, and a description of controls to reduce pollutants from these materials including storage practices to minimize exposure of the materials to stormwater, and spill-prevention and response;
(g) 
Temporary and permanent structural and vegetative measures to be used for soil stabilization, runoff control and sediment control for each stage of the project, from initial land clearing and grubbing to project close-out;
(h) 
A site map/construction drawing(s) specifying the location(s), size(s) and length(s) of each erosion and sediment control practice;
(i) 
Dimensions, material specifications and installation details for all erosion and sediment control practices, including the siting and sizing of any temporary sediment basins;
(j) 
Temporary practices that will be converted to permanent control measures;
(k) 
Implementation schedule for staging temporary erosion and sediment control practices, including the timing of initial placement and duration that each practice should remain in place;
(l) 
Maintenance schedule to ensure continuous and effective operation of the erosion and sediment control practice;
(m) 
Name(s) of the receiving water(s);
(n) 
Delineation of SWPPP implementation responsibilities for each part of the site;
(o) 
Description of structural practices designed to divert flows from exposed soils, store flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site to the degree attainable; and
(p) 
Any existing data that describes the stormwater runoff at the site.
(2) 
Land development activities meeting Condition A, B or C below shall also include water quantity and water quality controls (postconstruction stormwater runoff controls) as set forth in § 230-94B(3) of this article as applicable:
(a) 
Condition A: stormwater runoff from land development activity discharging a pollutant of concern to either an impaired water identified on DEC's 303(d) list of impaired waters or a total maximum daily load (TMDL) designated watershed for which pollutants in stormwater have been identified as a source of the impairment.
(b) 
Condition B: stormwater runoff from land development activity disturbing five or more acres.
(c) 
Condition C: stormwater runoff from land development activity disturbing between one and five acres of land during the course of the project, exclusive of the construction of single-family residences and construction activities at agricultural properties.
(3) 
SWPPP requirements for Conditions A, B or C (postconstruction stormwater runoff controls):
(a) 
All information in § 230-94B(1) of this article;
(b) 
Description of each postconstruction stormwater management practice;
(c) 
Site map/construction drawing(s) showing the specific location(s) and size(s) of each postconstruction stormwater management practice;
(d) 
Hydrologic and hydraulic analysis for all structural components of the stormwater management system for the applicable design storms;
(e) 
Comparison of postdevelopment stormwater runoff conditions with predevelopment conditions;
(f) 
Dimensions, material specifications and installation details for each postconstruction stormwater management practice;
(g) 
Maintenance schedule to ensure continuous and effective operation of each postconstruction stormwater management practice;
(h) 
Maintenance easements to ensure access to all stormwater management practices at the site for the purpose of inspection and repair. Easements shall be recorded on the plan and shall remain in effect with transfer of title to the property;
(i) 
Inspection and maintenance agreement binding on all subsequent landowners served by the on-site stormwater management measures in accordance with § 230-96 of this article; and
(j) 
For any land development activity meeting Condition A in § 230-94B(2), the SWPPP shall be prepared by a licensed professional and must be signed by the professional preparing the plan, who shall certify that the design of all stormwater management practices meets the requirements in this article.
C. 
Other environmental permits. The applicant shall assure that all other applicable environmental permits have been or will be acquired for the land development activity prior to approval of the final stormwater design plan.
D. 
Contractor certification.
(1) 
Each contractor and subcontractor identified in the SWPPP who will be involved in soil disturbance and/or stormwater management practice installation shall sign and date a copy of the following certification statement before undertaking any land development activity: "I certify under penalty of law that I understand and agree to comply with the terms and conditions of the stormwater pollution prevention plan. I also understand that it is unlawful for any person to cause or contribute to a violation of water quality standards."
(2) 
The certification must include the name and title of the person providing the signature, address and telephone number of the contracting firm; the address (or other identifying description) of the site; and the date the certification is made.
(3) 
The certification statement(s) shall be included with and become part of the SWPPP for the land development activity.
E. 
A copy of the SWPPP shall be retained at the site of the land development activity during construction from the date of initiation of construction activities to the date of final stabilization.
All land development activities shall be subject to the following performance and design criteria:
A. 
Technical standards. For the purposes of this article, the following documents shall serve as the official guides and specifications for stormwater management. Stormwater management practices that are designed and constructed in accordance with these technical documents shall be presumed to meet the standards imposed by this article:
(1) 
The Design Manual; and
(2) 
The Erosion Control Manual.
B. 
Equivalence to technical standards. Where stormwater management practices are not in accordance with technical standards, the applicant or developer must demonstrate equivalence to the technical standards set forth in § 230-95A of this article and the SWPPP shall be prepared by a licensed professional.
C. 
Water quality standards. Any land development activity shall not cause an increase in turbidity that will result in substantial visible contrast to natural conditions in surface waters of the state of New York.
A. 
Maintenance and inspection during construction.
(1) 
The applicant or developer of the land development activity or his or her representative shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the applicant or developer to achieve compliance with the conditions of this article. Sediment shall be removed from sediment traps or sediment ponds whenever their design capacity has been reduced by 50%.
(2) 
For land development activities meeting Condition A, B or C in § 230-94B(2) of this article, the applicant shall have a qualified professional conduct site inspections and document the effectiveness of all erosion and sediment control practices every seven days and within 24 hours of any storm event producing 0.5 inch of precipitation or more. Inspection reports shall be maintained in a site logbook.
B. 
Maintenance easement(s). Prior to the issuance of any approval that has a stormwater management facility as one of the requirements, the applicant or developer must execute a maintenance easement agreement that shall be binding on all subsequent landowners served by the stormwater management facility. The easement shall provide for access to the facility at reasonable times for periodic inspection by the City to ensure that the facility is maintained in proper working condition to meet design standards and any other provisions established by this article. The easement shall be recorded by the grantor in the office of the County Clerk after approval by the counsel for the City.
C. 
Maintenance after construction. The owner or operator of permanent stormwater management practices installed in accordance with this article shall ensure they are operated and maintained to achieve the goals of this article. Proper operation and maintenance also includes, as a minimum, the following:
(1) 
A preventive/corrective maintenance program for all critical facilities and systems of treatment and control (or related appurtenances) which are installed or used by the owner or operator to achieve the goals of this article.
(2) 
Written procedures for operation and maintenance and training new maintenance personnel.
(3) 
Discharges from the SMPs shall not exceed design criteria or cause or contribute to water quality standard violations in accordance with § 230-95 of this article.
(4) 
Maintenance agreements. The City shall approve a formal maintenance agreement for stormwater management facilities binding on all subsequent landowners and recorded in the office of the County Clerk as a deed restriction on the property prior to final plan approval. The maintenance agreement shall be consistent with the terms and conditions of Appendix A of this chapter entitled "Sample Stormwater Control Facility Maintenance Agreement.[1] The City, in lieu of a maintenance agreement, at its sole discretion, may accept dedication of any existing or future stormwater management facility, provided such facility meets all the requirements of this article and includes adequate and perpetual access and sufficient area, by easement or otherwise, for inspection and regular maintenance.
[1]
Editor's Note: Appendix A is on file in the office of the City Clerk.
A. 
Construction inspection.
(1) 
Erosion and sediment control inspection.
(a) 
The SMO may require such inspections as necessary to determine compliance with this article and may either approve that portion of the work completed or notify the applicant wherein the work fails to comply with the requirements of this article and the SWPPP as approved. To obtain inspections, the applicant shall notify the SMO at least 48 hours before any of the following, as required by the SMO:
[1] 
Start of construction;
[2] 
Installation of sediment and erosion control measures;
[3] 
Completion of site clearing;
[4] 
Completion of rough grading;
[5] 
Completion of final grading;
[6] 
Close of the construction season;
[7] 
Completion of final landscaping; or
[8] 
Successful establishment of landscaping in public areas.
(b) 
If any violations are found, the applicant and developer shall be notified in writing of the nature of the violation and the required corrective actions. No further work shall be conducted except for site stabilization until any violations are corrected and all work previously completed has received approval by the SMO.
(2) 
Stormwater management practice inspections. The SMO is responsible for conducting inspections of SMPs. All applicants are required to submit as-built plans for any SMPs located on-site after final construction is completed. The plan must show the final design specifications for all stormwater management facilities and must be certified by a professional engineer.
(3) 
Inspection of stormwater facilities after project completion. Inspection programs shall be established on any reasonable basis, including but not limited to: routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; inspection of drainage basins or areas identified as higher-than-typical sources of sediment or other contaminants or pollutants; inspections of businesses or industries of a type associated with higher-than-usual discharges of contaminants or pollutants or with discharges of a type which are more likely than the typical discharge to cause violations of state or federal water or sediment quality standards or the SPDES stormwater permit; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to: reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in drainage control facilities; and evaluating the condition of drainage control facilities and other stormwater management practices.
(4) 
Submission of reports. The SMO may require monitoring and reporting from entities subject to this article as are necessary to determine compliance with this article.
(5) 
Right-of-entry for inspection. When any new stormwater management facility is installed on private property or when any new connection is made between private property and the public stormwater system, the landowner shall grant to the City the right to enter the property at reasonable times and in a reasonable manner for the purpose of inspection as specified in § 230-97A(3) of this article.
B. 
Performance guarantee.
(1) 
Construction completion guarantee. In order to ensure the full and faithful completion of all land development activities related to compliance with all conditions set forth by the City in its approval of the SWPPP, the may require the applicant or developer to provide, prior to construction, a performance bond, cash escrow, or irrevocable letter of credit from an appropriate financial or surety institution which guarantees satisfactory completion of the project and names the City as the beneficiary. The security shall be in an amount to be determined by the City based on submission of final design plans, with reference to actual construction and landscaping costs. The performance guarantee shall remain in force until the surety is released from liability by the City, provided that such period shall not be less than one year from the date of final acceptance or such other certification that the facility(ies) have been constructed in accordance with the approved plans and specifications and that a one-year inspection has been conducted and the facilities have been found to be acceptable to City. Per annum interest on cash escrow deposits shall be reinvested in the account until the surety is released from liability.
(2) 
Maintenance guarantee. Where stormwater management and erosion and sediment control facilities are to be operated and maintained by the developer or by a corporation that owns or manages a commercial or industrial facility, the developer, prior to construction, may be required to provide the City with an irrevocable letter of credit from an approved financial institution or surety to ensure proper operation and maintenance of all stormwater management and erosion control facilities both during and after construction, and until the facilities are removed from operation. If the developer or landowner fails to properly operate and maintain stormwater management and erosion and sediment control facilities, the City may draw upon the account to cover the costs of proper operation and maintenance, including engineering and inspection costs.
(3) 
Recordkeeping. The City may require entities subject to this article to maintain records demonstrating compliance with this article.
C. 
Enforcement and penalties.
(1) 
Notice of violation. When the City determines that a land development activity is not being carried out in accordance with the requirements of this article, it may issue a written notice of violation to the landowner. The notice of violation shall contain:
(a) 
The name and address of the landowner, developer or applicant;
(b) 
The address, when available, or a description of the building, structure or land upon which the violation is occurring;
(c) 
A statement specifying the nature of the violation;
(d) 
A description of the remedial measures necessary to bring the land development activity into compliance with this article and a time schedule for the completion of such remedial action;
(e) 
A statement of the penalty or penalties that shall or may be assessed against the person to whom the notice of violation is directed; and
(f) 
A statement that the determination of violation may be appealed to the City Council by filing a written notice of appeal within 15 days of service of notice of violation.
(2) 
Stop-work orders. The City may issue a stop-work order for violations of this article. Persons receiving a stop-work order shall be required to halt all land development activities, except those activities that address the violations leading to the stop-work order. The stop-work order shall be in effect until the City confirms that the land development activity is in compliance and the violation has been satisfactorily addressed. Failure to address a stop-work order in a timely manner may result in civil, criminal, or monetary penalties in accordance with the enforcement measures authorized in this article.
(3) 
Violations. Any land development activity that is commenced or is conducted contrary to this article, may be restrained by injunction or otherwise abated in a manner provided by law.
(4) 
Penalties. Except as otherwise stated in this article, violations of this article are punishable as provided in § 1-3 of this Code.
(5) 
Withholding of certificate of occupancy. If any building or land development activity is installed or conducted in violation of this article, the SMO may prevent the occupancy of said building or land.
(6) 
Restoration of lands. Any violator may be required to restore land to its undisturbed condition. In the event that restoration is not undertaken within a reasonable time after notice, the City may take necessary corrective action, the cost of which shall become a lien upon the property until paid.
D. 
Fees. In addition to any other fees required by law, any person undertaking a land development activity regulated by this article shall, upon submission of a stormwater pollution prevention plan (SWPPP) to the City, pay the following fees for review of the SWPPP and any subsequent revisions thereto and for related inspections authorized by this article. Such fees may be amended by the City Council from time to time by resolution.
(1) 
Fees for land development activities. Any applicant or developer submitting a SWPPP to the City for a project to be completed in a single phase shall pay the City a fee based on the acreage of the entire development, in accordance with the following fee schedule. Any applicant or developer submitting a SWPPP to the City for a project to be completed in multiple phases shall pay the City a fee based on the acreage of the entire development, including the acreage of subsequent phases that are part of a common scheme of development or sale, in accordance with the following fee schedule, and shall also submit the fees required under § 230-97D(2) below.
Acreage of Entire Development
SWPPP Review and Inspection Fee
0 to 5 acres
$500
5 to 10 acres
$850
Over 10 acres
$850 + $300 for every 5 acres above 10 acres
(2) 
Fees for subsequent phases. For all land development activities to be completed in multiple phases over time, the applicant or developer, in addition to the fee provided for in § 230-97D(1) above, shall pay the City an additional $500 for each subsequent phase after the first phase of the project, to be paid at the beginning of each such subsequent phase.