A.
By petition. Property owners abutting public or traveled ways in which there is no water main pipe or in which the existing main is not considered adequate and who desire a new water main or extension of an existing main shall petition the Board for such installation no later than 90 days before the next regular Town Meeting or Special Town Meeting called for this purpose. The petition shall contain the names, addresses and signatures of all property owners requesting the extension.
B.
Action by Board on petition. Upon the request of any such petition, the Board will determine the locations, specifications, size and amount of pipe, and required appurtenances and estimate the cost of the proposed water main. The Board will draft a proper article or articles providing for installation and financing of the proposed water main and will present said article to the petitioners no later than 30 days before the Town Meeting, so that the petitioners can properly insert the article or articles in the Town Meeting warrant. The Board will also notify the Town Finance Committee of such action, together with its recommendation of approval or disapproval of the article. Recommendation for approval will be based on the number of petitioners, the benefit of the proposed water main to the system, anticipated revenue, available finances and the degree to which the proposed water main is required in the interest of health and safety. In certain instances, where the cost of the main is small and Department finances are available, the Board may include the installation and expense of the proposed water main as part of a general article to be inserted in the warrant for Department construction.
C.
Mains installed by Board. With or without petition by property owners, the Board may initiate action at any time to install new or additional water mains to any public way or in any right-of-way or easement obtained for such purpose and whenever it sees fit that such mains are necessary for the improvement, reinforcement, or satisfactory operation of the water supply system. In such cases, the Board will draft the necessary special articles or include the proposed construction as part of a general article for Department construction, all as may be necessary under the law for insertion in the Town Meeting warrant.