A.
The Borough of Highland Park has recently received and/or expects to receive multiple requests from entities engaged in the telecommunications business seeking the Borough's permission to use the Borough right-of-way, Borough streets, and/or existing easements previously granted by the Borough, the public utilities for the purpose of installing fiber optic cable either overhead on existing utility poles or within underground conduits. The Borough is desirous of being supportive of this emerging innovative technology creating and expanding an information superhighway and desires to establish an uniform mode of dealing with such requests.
B.
These requests from telecommunications providers require substantial review by Borough officials, including its Engineering and Public Works Departments, before permission can be granted since it will often involve the excavation of Borough streets, placement of construction vehicles partially blocking traffic on the Borough streets, and the need for additional police services during inspection of the construction. For those purposes, the imposition of an administrative fee geared to the magnitude of the installation, constitutes an appropriate balance between the needs of the telecommunications provider and of the Borough to protect and promote the public safety and welfare of its inhabitants.