Prior to the granting of final plat approval,
the subdivider shall have installed or shall have furnished an adequate
performance bond for the installation within a specified time, the
required improvements listed and described in this section. All of
the required improvements shall be made in full compliance with the
specifications for each of the various units of work as required by
the municipality or the state and county health authorities, according
to the nature of the improvements. Required improvements shall not
be considered complete until the subdivider has provided to the Planning
Board one complete set of as-built or record drawings showing the
precise actual location, grades and elevations of all such improvements.
The lines of all streets or roads shall be monumented
with concrete, stone or cast iron pipe with monument caps flush with
the ground.
The developer shall connect each house and lot
with the public water supply, subject to Village approval.
The developer shall provide sanitary sewers
and laterals for each lot with proper connection to Village lines,
subject to Village approval.