Estimated Sewer Construction Cost
|
Fee*
(percent)
| |
---|---|---|
Up to $10,000
|
10.0
| |
$50,000
|
6.5
| |
$100,000
|
5.3
| |
$500,000
|
3.6
| |
$1,000,000
|
3.0
| |
$2,000,000
|
2.7
|
NOTES:
| ||
---|---|---|
*
|
Fee based on percent of estimated construction cost. Use arithmetic
average to determine percentages between costs shown.
|
Estimated Sewer Construction Cost
|
Fee*
(percent)
| |
---|---|---|
Up to $10,000
|
10.0
| |
$50,000
|
6.5
| |
$100,000
|
5.3
| |
$500,000
|
3.6
| |
$1,000,000
|
3.0
| |
$2,000,000
|
2.7
|
NOTES:
| ||
---|---|---|
*
|
Fee based on percent of estimated construction cost. Use arithmetic
average to determine percentages between costs shown.
|
Application for Sewer Connections
| |
No. _______________
| |
I, _________________________, owner of the premises situate
_________________________, hereby make application to lay and connect
said premises with the public sewer. I do hereby agree to have said
sewer laid in accordance with the rules, regulations, ordinances and
local laws of the Town of Fishkill for its sewer system.
| |
I hereby designate ____________________ as the drain layers
to lay and construct said sewer under this permit.
| |
Date
|
Owner
|
Permit
| |
No. _______________
| |
_________________________ owner of premises situate, as the
drain layers to lay and construct a sewer to connect his premises
with the public sewer, you are hereby permitted to do the work stated
below and no more, subject to the rules, regulations, ordinances and
local laws of the Town of Fishkill, Dutchess County, New York, for
its sewer system, and under the supervision of Sewer Inspector.
| |
Location of Branch or Y
| |
The center of the Y-branch is located _____ feet from the center
of the manhole in front or in the rear of house, as measured along
the center line of the trunk sewer. Also, the end of the lateral is
_____ feet from the center of the trunk sewer.
| |
Date
|
Superintendent
|
Drain Layer's Return
| |
____________, 19 _____
| |
_________________________ hereby make return of the above and
certify that the work is executed strictly in accordance with the
above permit.
| |
Drain Layer
| |
Countersigned
| |
Sewer Inspector
|