A.
The Village Board hereby designates the Village Building Inspector as the official to receive, process and, following approval by the Village Board, issue zoning permits.
B.
Cases when a zoning permit is required:
(1)
Before any building or other structure which is the principal permitted use is erected, moved or structurally altered so as to change its use or increase its floor area.
(2)
Before any land use is substantially altered.
(3)
Before any building or structure is erected or substantially altered which would be a conditional use or require a variance regardless of whether principal or accessory use.
(4)
Before building an accessory structure, even though not intended for human occupancy.
C.
The permit application shall be made to the Village Building Inspector on forms provided by the Village. Applications shall be submitted in duplicate. The application shall include the following information:
(1)
Names and addresses of the contractor.
(2)
Description of the subject site by lot, block and recorded subdivision or by metes and bounds; address of the subject site; type of structure; existing and proposed operation or use of the structure or site; number of employees; and the zoning district within which the subject site lies.
(3)
Plat of survey prepared by a registered land surveyor showing the location, boundaries, dimensions, elevations, uses and size of the following: subject site; existing and proposed structures; existing and proposed easements, streets and other public ways; off-street parking, loading areas and driveways; existing highway access restrictions; existing and proposed street, side and rear yards. In addition, the plat of survey shall show the location, elevation and use of any abutting lands and their structures within 40 feet of the subject site.
(4)
Proposed sewage disposal plan. If Village sewerage service is not available this plan shall be reviewed by the Village Engineer, who shall certify in writing that satisfactory, adequate and safe sewage disposal is possible on the site as proposed by the plan in accordance with applicable local, county and state health regulations.
(5)
Proposed water supply plan if Village water service is not available. This plan shall be reviewed by the Village Engineer, who shall certify in writing that an adequate and safe supply of water will be provided.
D.
The Village Building Inspector shall review the application and, if the application is complete and contains all required information, shall refer it to the Village Board.
E.
Upon referral of the application, the Village Board shall schedule a public hearing thereon as soon as practical and the Village Board shall notice said hearing as deemed appropriate.
F.
Decision.
(1)
Following public hearing, necessary study and investigation, and consideration by and recommendation from the Plan Commission, the Village Board shall render its decision in writing and a copy made a permanent part of the Board's minutes. Such decision shall include an accurate description of the zoning use permitted, of the property on which permitted, and any and all conditions made applicable thereto or, if disapproved, shall indicate the reasons for disapproval. The Village Board may impose any conditions or exemptions necessary to minimize any burden on any persons affected by granting the zoning permit.[2]
(2)
A zoning permit shall be granted or denied in writing by the Village Board within 30 days or within 60 days of said date when site plan approval or a conditional use permit is required. The permit shall expire within six months unless substantial work has commenced. Any permit issued in conflict with the provisions of this chapter shall be null and void.
G.
When a zoning permit does not continue in conformity with the conditions of the original approval, or where a change in the character of the surrounding area or of the use itself causes it to be no longer compatible with surrounding areas, or for similar cause based upon consideration for the public welfare, the special grant may be terminated by action of the Village Board following a public hearing thereon.
H.
Subsequent change or addition to the approved plans or use shall first be submitted for approval to the Village Board and if, in the opinion of the Village Board, such change or addition constitutes a substantial alteration, a public hearing before the Board shall be required and notice thereof be given.