No application for approval of a land development
activity shall be reviewed until the appropriate board has received
a stormwater pollution prevention plan (SWPPP) prepared in accordance
with the specifications in this chapter.
The SWPPP shall be prepared by a landscape architect,
certified professional or professional engineer and must be signed
by the professional preparing the plan, who shall certify that the
design of all stormwater management practices meet the requirements
in this chapter.
The applicant shall assure that all other applicable
environmental permits have been or will be acquired for the land development
activity prior to approval of the final stormwater design plan.
A copy of the SWPPP shall be retained at the
site of the land development activity during the construction from
the date of initiation of construction activities to the date of final
stabilization.