A.
New sanitary sewers and all extensions to sanitary sewers, along with pumping stations and any other facility or appurtenances, in the Village of Pulaski or on private property or in a Town Sewer District shall be designed by a professional engineer, licensed to practice sewer design in the State of New York, in accordance with the Recommended Standards for Sewage Works, as adopted by the Great Lakes - Upper Mississippi River Board of State Sanitary Engineers ("Ten State Standards"), and in accordance with this article, and in strict conformance with all requirements of the NYSDEC, and any additional requirements of the Village Board, Superintendent, or Village Engineer.
B.
Plans and specifications shall be submitted to, and written approval shall be obtained from the Village's Engineer, Superintendent, the Oswego County Department of Health, and the NYSDEC, before initiating any construction. The design shall anticipate and allow for flows from all possible future extensions or developments within the tributary drainage area and shall consider the effects of the POTW downstream for the extension or development.
C.
If, however, there is inadequate capacity in any sewer which would convey the wastewater or if there is insufficient capacity in the POTW treatment plant to treat the wastewater properly or if addition of the wastewater would cause the collective limits of flow or any other parameter from the Village's POTW to exceed those allowable in an applicable intercommunity agreement, the application shall be denied. Sewer line and POTW treatment plant current use shall be defined as the present use and the unutilized use which has been committed, by resolution or written agreement, to other users by the Superintendent, Village of Pulaski Board, and/or other persons with such authority as allowable by an intercommunity agreement.