[Amended 3-18-1985]
Since considerable soil erosion can take place during construction, plans shall contain both proposed erosion and sediment control measures and a timetable for development and control. These measures shall be incorporated into the final plat, site plan or plot plan and the final construction drawings. Erosion and sediment control measures shall conform to the standards and specifications established by the Town of Wappinger. These measures shall apply to all features of the construction site, including street and utility installations as well as to the protection of individual lots. Measures shall also be instituted to prevent or control erosion and sedimentation during various stages of development.