Skip to content
home
Home
code
Code
Code
law
Laws (0)
New Laws (0)
Law Ledger (0)
pubdocs
Public Documents
Public Documents
Board of Trustees Agendas (16)
Board of Trustees Meeting Packets (20)
Board of Trustees Minutes (33)
Board of Trustees Resolutions (61)
Budgets (6)
Documents (97)
Planning Board (32)
Public Notices (8)
Village Election (7)
Zoning Board of Appeals (28)
help_center
Help
Help
About Us
ecode
search
Login
Village of Tivoli, NY
chevron_right
chevron_right
Part II General Legislation
chevron_right
Chapter 177 Sewers
Chapter 177
Sewers
[HISTORY: Adopted by the Board of Trustees of the Village of Tivoli
5-11-1998
by
L.L. No. 1-1998
. Amendments noted where applicable.]
Article I
Title and Purpose
§ 177-1
Short title.
§ 177-2
General purpose.
§ 177-3
Specific purposes.
§ 177-4
Replacement of previous Sewer Use Law.
Article II
Terminology
§ 177-5
Definitions; word usage.
§ 177-6
Abbreviations.
§ 177-7
Undefined terms.
Article III
Use of Public Sewers Required
§ 177-8
Waste disposal unlawful.
§ 177-9
Connecting private sewage system to storm sewer unlawful.
§ 177-10
Discharge of sewage into well prohibited.
§ 177-11
Wastewater discharge unlawful.
§ 177-12
Building permit allowed only when approved wastewater disposal available.
§ 177-13
Private wastewater disposal unlawful.
§ 177-14
Connection to public sewer required.
§ 177-15
Limitation on use of public sewers.
§ 177-16
Wastewater from outside the POTW service area; intermunicipal agreements.
§ 177-17
Moratorium.
§ 177-18
Basis of sewer use requirement.
Article IV
Private Wastewater Disposal
§ 177-19
Public sewer unavailable; private wastewater disposal required.
§ 177-20
Connection of two buildings to the same septic tank prohibited.
§ 177-21
Construction permit application.
§ 177-22
Construction permit.
§ 177-23
Preventing nuisances; rehabilitation required.
§ 177-24
Sanitary operation required.
§ 177-25
Septage removal.
§ 177-26
Direct connection to new public sewers required.
§ 177-27
Additional requirements.
Article V
New Sewers or Sewer Extensions
§ 177-28
Proper design.
§ 177-29
New sewers subject to approval, fees, inspection, testing and reporting.
§ 177-30
Plans, specifications and pipe test results required.
§ 177-31
Sewer pipe.
§ 177-32
Safety and load factors.
§ 177-33
Sewer pipe installation.
§ 177-34
Cleanout installation.
§ 177-35
Manholes and manhole installation.
§ 177-36
Infiltration/exfiltration testing.
§ 177-37
Test section.
§ 177-38
Test period.
§ 177-39
Pipe lamping.
§ 177-40
Deflection testing.
§ 177-41
Low-pressure air testing alternative.
§ 177-42
Vacuum testing alternative.
§ 177-43
Force mains.
§ 177-44
Force main testing.
§ 177-45
Final acceptance and warranty/surety.
§ 177-46
Liability insurance coverage during construction period.
Article VI
Building Laterals, Street Laterals Connections and Fees
§ 177-47
Permit required for sewer connections.
§ 177-48
Inflow/infiltration prohibited.
§ 177-49
Sewer lateral permits.
§ 177-50
New building laterals.
§ 177-51
Laterals serving several buildings.
§ 177-52
Laterals serving complexes.
§ 177-53
Dry sewers.
§ 177-54
Using existing building laterals.
§ 177-55
Lateral pipe materials.
§ 177-56
Street lateral to public sewer connection.
§ 177-57
Future connection locations; as-built drawings.
§ 177-58
Special manhole requirements.
§ 177-59
Laterals at and near buildings.
§ 177-60
Sewage lifting.
§ 177-61
Lateral pipe installation.
§ 177-62
Watertight joints.
§ 177-63
Cast-iron pipe poured joints.
§ 177-64
Cast-iron push joints.
§ 177-65
PVC push joints.
§ 177-66
Building lateral/street lateral connection.
§ 177-67
Cleanout repair/replacement.
§ 177-68
Street lateral replacement; ownership.
§ 177-69
Testing.
§ 177-70
Connection inspection.
§ 177-71
Trench inspections.
§ 177-72
Public safety provisions required; restoration of disturbed areas.
§ 177-73
Interior cleanout.
§ 177-74
Costs borne by owner.
Article VII
Inflow
§ 177-75
New inflow sources prohibited.
§ 177-76
Disconnection of existing inflow sources.
§ 177-77
Disconnection when property sold.
§ 177-78
Reconnection of inflow source prohibited.
§ 177-79
Charges for inflow.
Article VIII
Trucked or Hauled Waste
§ 177-80
Licenses and application.
§ 177-81
Concurrent requirements.
§ 177-82
Dumping location and timing.
§ 177-83
Notification of dumping.
Article IX
Discharge Restrictions
§ 177-84
Pretreatment standards.
§ 177-85
General prohibitions.
§ 177-86
Concentration based limitations.
§ 177-87
Mass discharge based limitations.
§ 177-88
Modification of limitations.
§ 177-89
Access to user's records.
§ 177-90
Dilution.
§ 177-91
Grease, oil and sand interceptors.
§ 177-92
Solid waste grinders.
§ 177-93
Rejection of wastewater.
Article X
Discharge Permits and Pretreatment Requirements
§ 177-94
Wastewater discharge reports.
§ 177-95
Notification to industrial users.
§ 177-96
Wastewater discharges.
§ 177-97
Wastewater discharge permits required for significant industrial users.
§ 177-98
Other industrial users.
§ 177-99
Discharge permits to storm sewers not authorized.
§ 177-100
Application for wastewater discharge permits.
§ 177-101
Permit modifications.
§ 177-102
Permit conditions.
§ 177-103
Permit duration.
§ 177-104
Permit reissuance.
§ 177-105
Permit transfer.
§ 177-106
Permit revocation.
§ 177-107
Reporting requirements for permittee.
§ 177-108
Flow equalization.
§ 177-109
Monitoring stations (control manholes).
§ 177-110
Proper design and maintenance of facilities and monitoring stations.
§ 177-111
Vandalism; tampering with measuring devices.
§ 177-112
Sampling and analysis.
§ 177-113
Accidental discharges; SPCC Plan.
§ 177-114
Posting notices.
§ 177-115
Sample splitting.
§ 177-116
Public access to information maintained by the Superintendent.
§ 177-117
Access to property and records.
§ 177-118
Access to easements.
§ 177-119
Liability of property owner.
§ 177-120
Special agreements.
Article XI
Enforcement and Penalties
§ 177-121
Enforcement Response Plan.
§ 177-122
Notification of violation.
§ 177-123
Consent orders.
§ 177-124
Administrative or compliance orders.
§ 177-125
Administrative fines.
§ 177-126
Cease and desist orders.
§ 177-127
Termination of permit.
§ 177-128
Water supply severance.
§ 177-129
Show cause hearing.
§ 177-130
Failure of user to petition the Superintendent.
§ 177-131
Notice.
§ 177-132
Right to choose multiple remedies.
§ 177-133
Civil actions for penalties.
§ 177-134
Court orders.
§ 177-135
Criminal penalties.
§ 177-136
Additional injunctive relief.
§ 177-137
Summary abatement.
§ 177-138
Delinquent payments.
§ 177-139
Performance bonds.
§ 177-140
Liability insurance.
§ 177-141
Informant rewards.
§ 177-142
Public notification.
§ 177-143
Contractor listings.
Article XII
Charges
§ 177-144
Normal sewage service charges.
§ 177-145
Surcharge for abnormal sewage.
§ 177-146
Total sewer service charge.
§ 177-147
Segmenting the POTW.
§ 177-148
Measurement of flow.
§ 177-149
Billing period.
§ 177-150
Pretreatment program costs.
§ 177-151
Charges for trucked and hauled wastes.
§ 177-152
Capital recovery.
§ 177-153
Collection of charges.
§ 177-154
Fiscal year for system.
§ 177-155
Impact fees.
§ 177-156
Use of revenues.
§ 177-157
Records and accounts.
Article XIII
Public Disclosure of POTW Operations
§ 177-158
POTW operations open to the public.
§ 177-159
Procedural requirements available.
§ 177-160
Validity through public inspection.
Article XIV
Effective Date and Applicability
§ 177-161
Effective date.
§ 177-162
Applicability.