The Borough shall evaluate whether any discharger
to the POTW needs an accidental discharge/slug control plan. The supervisor
may require any discharger to develop, submit for approval, and implement
such a plan. Such plan shall address, at a minimum, the following:
A. Description of discharge practices, including nonroutine
batch discharges;
B. Description of stored chemicals;
C. Procedures for immediately notifying the supervisor of any accidental or slug discharge, as required by §
52-62 of this Part
3; and
D. Procedure to prevent accidental or slug discharges
from reaching the POTW. Such procedures include but are not limited
to inspection and maintenance of storage areas, handling and transfer
of materials, loading and unloading operations, control of plant site
runoff, worker training, building of containment structures or equipment,
measures for containing toxic organic pollutants, including solvents
and/or measures and equipment for emergency response.
Hauled wastewater shall not be accepted at the
POTW without special permission of the Borough.