[Amended 11-12-2013 by Ord. No. 13-07]
A.
Zoning permit.
(1)
Permit required. No building or other structure shall be erected, moved, added to or structurally altered and no lot shall be cleared, graded or otherwise prepared for an open land use without a proper use permit, conditional use permit or certificate of occupancy being issued therefor by the Zoning Officer. No zoning permit shall be issued unless the proposed use or structure is in conformity with the provisions of this chapter, except upon written order of the Planning Board.
(2)
Permit duration. Unless the use is commenced, lot cleared and graded, structure erected within one year from the date of the issuance of the permit or prior to a zoning change affecting the issuance of the permit, whichever occurs first, the permit shall be deemed void and of no effect. However, nothing shall prevent requesting the issuance of another permit which would then be evaluated in accordance with the existing land use regulations at the time application for said zoning permit is submitted.
B.
No building shall hereafter be used, erected, altered, converted, enlarged, added to, moved or reduced, wholly or in part, nor shall any lands be designed, used or physically altered for any purpose or in any manner except in conformity with this chapter.
C.
When a lot is formed from part of a lot already occupied by a building, any subdivision shall be effected in such a manner as not to impair any of the requirements of this chapter with respect to the existing building.
D.
No open space provided around any principal building for the purpose of complying with the front, side and/or rear yard provisions of this chapter shall be considered as providing the yard provisions for another principal building.
E.
Model buildings containing dwelling units (one or more) of the type permitted and approved to be sold are permitted subject to Planning Board approval. A model building may be freestanding or combined with a sales center, with the garage portion of a model building used as the sales center, provided that the garage must be converted to its automobile storage function prior to the conveyances of the combined model building/sales center to a purchaser and that any temporary accommodation, such as modified landscaping or walkways, must be removed and restored as otherwise approved by the Planning Board. A model building may receive a temporary certificate of occupancy, provided that all toilet facilities within that portion of a model building not approved to be used as a sales center shall not be functional and shall be labeled "Display Only: Do Not Use."