A.
Prior to granting of final approval, the subdivider shall have installed or shall have furnished performance guaranties for the ultimate installation of the following:
(1)
Streets.
(2)
Street signs.
(3)
Curbs and gutters.
(4)
Sidewalks.
(5)
Streetlighting.
(6)
Shade trees, to be located on the street line so as not to interfere with utilities or sidewalks, shall have a caliper of at least two (2) inches, heights ten (10) to twelve (12) feet and shall be one (1) of the following types: Ash (white, green), Gums (sweet), Lindens (silver, European, American, small leaf), Maples (Norway, red or sugar), Oaks (white, pin, common red, black), Sycamore. The trees shall be planted pursuant to specifications, standards or regulations adopted by the Planning Board.
(7)
No topsoil shall be removed from the site or used as spoil. Topsoil moved during the course of construction shall be redistributed so as to provide at least four (4) inches of cover to all areas of the subdivision and shall be stabilized by seeding or planting.
(9)
Water mains, culverts, storm sewers and sanitary sewers and such other installations shall be properly connected with an approved system and shall be adequate to handle all present and probable future development.
B.
All of the above listed improvements shall be subject to inspection and approval by the Borough Engineer, who shall be notified by the developer at least twenty-four (24) hours prior to the start of construction. No underground installation shall be covered until inspected and approved.