[Amended 9-17-1979 by Ord. No. 66-79; 7-21-1980 by Ord. No. 31-80; 11-21-1983 by Ord. No. 26-83; 3-18-1985 by Ord. No. 7-85; 5-20-1985 by Ord. No. 17-85; 11-18-1985 by Ord. No. 39-85; 10-19-1987 by Ord. No. 18-87; 5-20-2002 by Ord. No. 20-02; 6-17-2002 by Ord. No. 22-02; 4-21-2003 by Ord. No. 9-03; 2-16-2004 by Ord. No. 2-04; 8-16-2004 by Ord. No. 17-04; 6-20-2016 by Ord. No. 10-16; 5-20-2019 by Ord. No. 11-19]
No driveway shall be constructed, no existing driveway shall be altered, no additional dwelling(s) or building(s) or building addition(s) that result in the creation of an additional dwelling unit shall be connected to an existing driveway, and no new dwelling or building shall be constructed to replace a residential dwelling or building that has been substantially demolished and which was served by an existing driveway, within, along or connected to an existing or future street or road right-of-way, without first obtaining a driveway construction permit in accordance with the following:
A.
The applicant shall apply for a driveway permit, shall submit a plan of the proposed driveway per § 172-25, an application fee in the amount of $100 and an escrow fee deposit as follows:
(1)
Except for permits to pave or resurface an existing driveway only pursuant to Subsection F below, an escrow fee deposit in the amount of $500 shall be paid to the Township for each driveway permit for engineering review and inspections. The escrow fee deposit shall be administered in accordance with the provisions of § 159-53E and F, which provide for additional deposit requirements and return of unused escrow deposits.
B.
Permits shall be reviewed and issued by the Township Engineer or a consulting engineer retained by the Township for driveway application and road opening review purposes (hereinafter "consulting engineer").
C.
A driveway permit issued hereunder shall be valid for period of two years from the date of issuance.
D.
Major subdivisions requiring construction plans and inspection fees shall, by Township ordinance, be exempt from the above permit fee requirements; however, major subdividers shall comply with all other applicable sections of this chapter. Permits shall be required in major subdivisions where construction is not by the subdivider or his successor.
E.
Driveway construction in the Township right-of-way in accordance with the approved driveway permit shall not require a Township road opening permit.
F.
A fee of $100 shall be paid for a permit to pave or resurface an existing driveway only.