No building or structure shall be erected, moved,
added to, enlarged or structurally altered (except for any use consisting
primarily of tilling the soil or similar customary agricultural use)
without a zoning permit therefor, issued by the Zoning Officer in
compliance with this chapter.
A. The Zoning Officer shall make or cause to have made
an inspection of each building or lot for which a zoning permit has
been applied for before issuing such permit.
B. Expiration of permits.
(1) If the work for which a zoning permit has been issued
has not begun within six months from the date of issuance, the permit
shall expire.
(2) If the work for which a zoning permit has been issued
has not been substantially completed within two years of the date
of the permit, the zoning permit shall expire. At that time, the building
or land shall be restored to its approximate condition at the time
of issuance of the permit. Such restoration shall be completed within
30 days following the lapse of the time for the zoning permit.
(3) If the restoration is not completed at the end of
the thirty-day limit, the Village Board may take such action as is
detailed on the application for the original permit.