A.
Concrete monuments shall be set at the intersection of all lines forming angles in the boundary of the subdivision, including all points of curve and points of tangent.
B.
In minor subdivisions, the Board of Commissioners, upon recommendation of the Township Engineer, may waive the requirement for the number of monuments.
C.
The installation and certification shall be made by a registered surveyor prior to final approval of the subdivision. In lieu of such prior installation, the applicant shall furnish a cash deposit in the form of a certified check to guarantee the proper installation of the required monuments and bench marks. The refundable deposit shall be in an amount established from time to time by resolution of the Board of Commissioners.
D.
The location and tie-in dimensions of all monuments shall be shown on the plan for recording. No public improvements shall be accepted by the Township until all monuments have been set and certified to by a registered surveyor.