[Amended 8-3-2016 by Ord. No. 2016-8]
At the time of filing a subdivision or land development plat, the applicant shall present a check payable to Swatara Township in the amount prescribed by the most current fee resolution adopted by the Swatara Township Board of Commissioners to establish an escrow account. The escrow account shall be replenished when the account balance reaches the minimum threshold required in the fee resolution. Failure to replenish the escrow account will result in the suspension of engineer review and inspection services. Funds in the escrow account shall be used to cover the reasonable and necessary costs of:
A. Reviewing the plat's engineering details.
B. Inspecting the site layout for conformance with the plat.
C. Preparing cost estimates of required improvements (as applicable).
D. Inspecting required improvements during installation.
E. Final inspection on completion of installation of required improvements.
F. Other engineering verifications required by this chapter.