[Amended 4-17-2023 by Ord. No. 2023-01]
When changes from the approved plans become necessary during construction, written acceptance by the Township, with the advice of the Township Engineer, shall be secured before the execution of such changes.
Adequate provisions for the satisfactory maintenance of all streets shall be made by dedication to and acceptance for maintenance by the Township or by other acceptable means.
The owner shall install or cause to be installed, at the owner's expense, metal pole streetlights serviced by underground conduit in accordance with a plan approved by the Board of Supervisors in conformity with a general standard of streetlighting established by the Board of Supervisors. The equipment of metal poles may be waived in such instances as approved by the Board of Supervisors due to the existence of wooden poles already in place. Provision shall be made for energizing said lighting after 50% or more of the dwellings in a given subdivision or land development or section of a subdivision or land development have been occupied. The owner shall be responsible for all charges or rates of the streetlighting until such time that the streets are accepted or condemned as public streets by the Board of Supervisors.
If, at the time of final approval, public sanitary sewer facilities are not available to the subdivision or land development but will become available within a period of five years or a period determined by the Board of Supervisors from the date of recording, the owner shall be required to install or cause to be installed, at his expense, sanitary sewer collectors and sewer laterals to the street line in accordance with the requirements and standards of the Township Water and Sewer Authority and shall cap all laterals. Review and approval by the Authority shall be required.