Prior to application for a building permit, where required, site plan development approval shall be secured in accordance with the following procedure:
A.
Sketch review (all site plans).
B.
Preliminary approval (major site plan).
C.
Final approval (all site plans).
D.
Application and review process:
(1)
Informal review with technical personnel. Before filing a formal application in accordance with the procedure set forth in this article, applicants are encouraged to meet with the Town's technical personnel, including the Town Engineer, Building Inspector, Planning Consultant, Town Attorney and Fire, Police and Health Departments, where appropriate, prior to submitting a formal application for development. The purpose of the informal meeting is to make the applicant aware of the specific requirements applicable to the area or type of development being considered.
(2)
Complete application.
(a)
A complete application is required for the development of any land. Said application, together with the required fees and all exhibits required, shall be submitted to the Secretary of the Board. The Board shall:
(b)
An application shall be certified as complete immediately upon the meeting of all requirements specified in this chapter and all rules and regulations of the Board. It shall be deemed complete as of the day it is so determined by the Board for purposes of the commencement of the time period for action by the Board. If found to be incomplete, the application shall be returned to the applicant with information as to what is lacking.
(c)
Prior to formal application to the Board, the applicant shall submit to the Town Engineer, acting as technical staff to the Board, the information required to meet the requirements of the New York State Environmental Quality Review Act (SEQRA). Notwithstanding the time limits set forth herein, final site plan approval shall not be granted until the SEQRA process has been completed. The Board may hold a joint public hearing on the site plan, whenever practicable. In the event that a final SEQRA determination has not been made, final site plan approval shall not be granted.
(3)
Additional information. The Board may require such additional information not specified in this chapter or any revisions in the accompanying documents as are reasonably necessary to make an informed decision as to whether the requirements necessary for approval of the application for development have been met. The application shall not be deemed incomplete for lack of any such additional information or any revisions in the accompanying documents so required by the Boards.
(4)
Routing.
(a)
Zoning Board of Appeals. All complete applications requiring Zoning Board of Appeals approval shall be referred to that Board by the Board.
(b)
Building Inspector. All complete applications for one-family residential construction which is not in a floodplain or is not a historic building or site shall be referred to the Building Inspector for action.
(c)
Board technical staff. All other applications for development shall be forwarded by the Board to the Board technical staff for review.
(5)
Application contents, requests and submissions. All applications for site development plan review and/or approval shall fulfill the following requirements:
(6)
Fees. Upon the filing of an application for sketch review, a fee shall be payable to the Town of Haverstraw in accordance with the Standard Schedule of Fees as adopted by the Town Board and as amended periodically.