Before the Planning Board grants final approval of the subdivision plat, the subdivider shall follow the procedure set forth in either Subsection A or B below:
A.
In an amount set by the Planning Board the subdivider shall either file with the Town Clerk a certified check to cover the full cost of the required improvements or the subdivider shall file with the Town Clerk a performance bond to cover the full cost of the required improvements. Any such bond shall comply with the requirements of § 277 of the Town Law and further shall be satisfactory to the Town Board and Town Attorney as to form, sufficiency, manner of execution and surety. A period of one year (or such other period as the Planning Board may determine appropriate, not to exceed three years) shall be set forth in the bond within which required improvements must be completed.
B.
The subdivider shall complete all required improvements to the satisfaction of the Town Engineer, who shall file with the Planning Board a letter signifying the satisfactory completion of all improvements required by the Board. For any required improvements not so completed, the subdivider shall file with the Town Clerk a bond or certified check covering the costs of such improvements and the cost of satisfactorily installing any improvement not approved by the Town Engineer. Any such bond shall be satisfactory to the Town Board and Town Attorney as to form, sufficiency, manner of execution, and surety.
C.
The required improvements shall not be considered to be complete until the installation of the improvements has been approved by the Town Engineer and a map satisfactory to the Planning Board has been submitted indicating the location of monuments marking all underground utilities as actually installed. If the subdivider completes all required improvements according to Subsection B, above, then said map shall be submitted prior to endorsement of the plat by the appropriate Planning Board officer. However, if the subdivider elects to provide a bond or certified check for all required improvements as specified in Subsection A, above, such bond shall not be released until such a map is submitted.