A.
Notice for final inspection shall be given to the County for all private sewage systems installed, modified or reconnected. Notice for inspection shall be given 24 hours in advance. Failure to notify the Zoning Department 24 hours in advance will result in an additional fee under § 518-24B(7).
C.
Notification for final inspection shall be given in accordance with the requirements of Chapter SPS 383, Wisconsin Administrative Code.
D.
When a private sewage system is ready for inspection, the plumber in charge shall make arrangements to enable the inspector to inspect all parts of the system. The plumber shall provide the proper apparatus, equipment and necessary assistance to make a proper inspection.
E.
Private sewage systems may be inspected periodically, after the initial installation inspection(s) and/or after the system is operative, as deemed necessary by the County.