Upon posting of the performance bond in accordance with this
chapter and after approval and filing of the open development area
plan as required, the developer may initiate land sales or construction
of the open development area itself.
The Town Board, in considering an application for an open development
area plan, shall be guided by the following considerations and standards:
A. General.
(1) Character of land. Land to be developed shall be of such character
that it can be used safely for building purposes without danger to
health or peril from fire, flood or other menace.
(2) Conformity to Official Map and Comprehensive Plan. The open development
area shall conform to the streets and parks shown on the Official
Map as may be adopted and shall be properly related to the Comprehensive
Plan as it is developed and adopted by the Planning Board.
B. Design standards.
(1) Access roadways.
(a)
Access roadways shall be designed either with a cul-de-sac or
circular way to preclude any use other than access to or exit from
property in the development.
(b)
All access roadway widths shall be measured at right angles
or radial to the center line of the municipally owned street and shall
not be less than a fifty-foot right-of-way with a gravel surface not
less than 20 feet, in order to meet International Building Code requirements.
(c)
All access roadway widths and street pavements shall be measured
at right angles or radial to the center line of the street.
(d)
The specifications for construction and maintenance of the right-of-way
shall be established by the Town Engineer and must be submitted with
the preliminary development area plan for recommendation by the Planning
Board and Town Engineer and final approval by the Town Board. If the
enforcement of the provisions of this section would entail practical
difficulty or unnecessary hardship, or where the circumstances of
a case do not require the structure to be related to existing or proposed
streets or highways, the Board may make any reasonable exception and
issue the permit subject to conditions that will protect any further
street or highway layout.
The Town Board may modify the specification requirements in
any open development area plan where, in the Board's judgment,
such modification is in the public interest or will avoid the imposition
of unnecessary individual hardship as stipulated in this chapter.
The developer, before the approval of the open development area
plan, shall complete improvements to the satisfaction of the Town
Engineer or post a performance bond sufficient to insure the satisfactory
completion of the following required improvements, except where waivers
may be required, and the Town Board may waive, subject to appropriate
conditions, such improvements as it considers are not requisite in
the interest of public health, safety and general welfare:
B. Storm drains, culverts and catch basins (SWPP).
D. State Environmental Quality Review Act requirements.
All deeds and easements of all or part of the real property
subject to the requirements and conditions of the open development
chapter approved herein shall contain the following provision: "This
conveyance is made and accepted subject to the open development area
plan approved by the Town Board of the Town of Wales on the _____
day of __________, 20 _____."