A. 
Easements shall be established to accommodate the existence of drainageways.
B. 
Easements shall be established for all on-site stormwater management or drainage facilities, including but not limited to: detention facilities (above or below ground), infiltration facilities, all stormwater BMPs, drainage swales, and other drainage facilities (inlets, manholes, pipes, etc.).
C. 
Easements are required for all areas used for off-site stormwater control.
D. 
All easements shall be a minimum of 20 feet wide.
E. 
Whenever possible, easements shall provide ingress to and egress from a public right-of-way. In lieu of providing an easement to the public right-of-way, a note may be added to the plan granting the Township or its designees access to all easements via the nearest public right-of-way.
F. 
Where possible, easements shall be centered on or parallel to side and/or rear lot lines.
G. 
The following note shall be placed on the recorded plan: "Nothing shall be placed, planted, or set within an easement or right-of-way which would adversely affect the function of the easement or right-of-way, or conflict with any conditions associated with such easement or right-of-way."
H. 
A note shall be placed on the SWM site plan identifying the party responsible for assuring the continued functionality and required maintenance of any easement.