The following supplementary studies and plans shall be reviewed
in conjunction with the review of preliminary and/or final plans.
They shall be determining factors in the acceptance or rejection of
the plans, and shall include, but not be limited to, the following
sections.
The conservation plan shall show the total tract and be clearly
and legibly drawn to the same size and scale as that of the preliminary
and final plan and shall be in the form of an overall plan.
A. Contour lines at vertical intervals of not more than two feet.
B. Location and elevation of the bench mark to which contour elevations
refer. Where reasonable and practical, datum used shall be USGS from
a known, established bench mark. All subdivisions and/or land developments
shall have actual field run or aerial topography.
C. Location and ownership of all existing watercourses, floodplain areas,
wetlands, tree masses, specimen trees, soil types and other significant
natural or man-made features within the proposed subdivision and within
50 feet of the boundaries of the proposed subdivision.
[Amended 7-22-2002 by Ord. No. 2002-5]
D. Location and results of soil percolation tests whenever on-site disposal
of sewage is planned.
E. Location and type of all erosion and sedimentation control measures, including, but not limited to, tire cleaners, retention basins, silt fences and hay bales; proposed dates when such measures shall be in effect, and supporting data assuring compliance with the erosion and sedimentation control standards set forth in Chapter
80, Erosion, Sediment Control and Grading. A note shall be added to the plans indicating that the applicant is responsible for installation and maintenance of all soil and erosion control measures until closeout of the escrow account.
F. Notations indicating all significant site vegetation, trees or portions
of tree masses proposed to be cleared as part of the proposed subdivision
or development plan. Notations shall be included indicating all proposed
alterations of the natural grade, whether by cut or by fill, exceeding
five feet, together with reasons for such alterations.
G. Chapter
80, Erosion, Sediment Control and Grading, is hereby made a part of this chapter and all of its requirements are applicable to any subdivision or land development as defined in this chapter. The applicant shall take whatever measures are necessary to ensure that no silt or mud leaves the property being developed up to dedication and/or closeout of the escrow account.
The landscape plan shall show the entire tract, be clearly and
legibly drawn to the same size and scale as that of the preliminary
and final plans, shall be in the form of an overall plan and shall
include:
B. Tract boundaries and the zoning classification of all abutting properties.
C. Floodplain areas within and adjacent to the tract.
D. All bodies of water, waterways and drainage swales, showing the direction
of flow within the tract.
E. All existing tree masses and specimen trees shall be noted and sufficiently
labeled.
F. The location and type of all proposed landscaping and/or ground cover
in buffer areas, common open space and entrances shall be shown.
G. A full plantings list showing the proper and common name along with
the size and grade shall be provided.
The following supplementary studies, when required by the Township,
shall be reviewed in conjunction with the review of the preliminary
and/or final plans. They shall be determining factors in the acceptance
or rejection of the plans and shall include, but not be limited to,
the following:
A. Traffic impact study. A traffic impact study shall be required for
any subdivision or land development that is expected to generate more
than 250 total average weekday trip-ends after build-out. The traffic
impact study shall include, but not be limited to, the following:
[Amended 7-22-2002 by Ord. No. 2002-5]
(1)
Scope and nature of the entire proposed development.
(2)
Description of proposed access points.
(3)
Existing conditions and uses of roads and intersections adjacent
to the property, accessing the property and in the vicinity of the
property.
(d)
Shoulder/parking lane widths.
(e)
Intersection turning movements for the peak hour of travel.
(f)
Average annual daily traffic counts.
(g)
Peak hour traffic counts (Thursday and Friday during any month
from April to November).
(4)
Calculation of capacity of all approaches to all intersections
in the vicinity of the development. It is strongly suggested that
the capacity analysis be based on the procedure established in the
1985 Highway Capacity Manual, Special Report 209, Transportation Research
Board. This standardized methodology is formulated around the following
factors:
(a)
Width and marking of approach lanes.
(c)
One-way, two-way operations.
(5)
Estimate of potential peak hour trip generation based on procedures
established in the Trip Generation Manual, Institute of Transportation
Engineers (I.T.E.), latest published edition, 1987, and shall be formulated
around the following factors:
(d)
Type of ingress and egress traffic movement.
(6)
Distribution of traffic. Assign traffic to particular access points, streets and intersections using marketing studies, work trip (origin-destination data or traffic simulation models). See also Subsection
A(5) above.
(7)
Comparison of existing peak hour counts and existing capacities
of each intersection.
(8)
Comparison of existing peak hour counts plus traffic generated by the development plus assumed annual increase in traffic and existing capacities of each intersection. See also Subsection
A(6) above.
(9)
Description of necessary improvements to accommodate future traffic [if Subsection
A(8) above shows an unacceptable level of service].
(11)
Implementation strategy.
|
NOTE: For all capacity analyses, Westtown shall be considered
a residential area for "location within metropolitan area" and "metropolitan
area population" shall be 75,000.
|
B. Water study. The water study shall include but not be limited to
the following, and, where applicable, plans shall be drawn to the
same scale and be of the same size as that of the corresponding preliminary
plan:
(1)
The following information shall be supplied in a combination
of drawn plans and written material for both on-site and community
system applicants:
(a)
Scope and nature of the entire proposed development, including:
[1]
Acreage of total tract and size of all individual lots and parcels.
[2]
Location of tract showing use and size of all abutting and adjacent
properties.
[3]
Intended uses of all lots, parcels and structures along with
the total number of structures and total population within the development
at the time of full build-out.
(2)
Complete description of existing conditions found within and
surrounding the proposed development, including:
(a)
Location and size of all waterways and bodies of water (including
underground within the tract and abutting and adjacent properties).
(b)
Location and size of all floodplain areas within the tract.
(c)
Topography and geology data including soil types, strata and
elevations within the tract showing a certified geologist's report
as to the expected rate and/or supply from the particular water supply
strata.
(d)
Existing water supplies, distribution and sewage treatment facilities
servicing the tract and all abutting and adjacent properties to the
tract.
(3)
Complete description of both existing and proposed fire protection facilities within the tract, and where applicable within all abutting properties. Specifications shall comply with those found in §§
149-917 and
149-918 of this chapter and shall show:
(a)
Full plan of existing and proposed fire hydrant locations.
(b)
Source, capacity and pressure for all existing and proposed
hydrants and/or other fire protection water sources.
(c)
Proposed commercial and industrial developments shall also show:
[1]
Use and/or storage of all chemicals and other flammable materials
per structure.
[2]
Water needs other than for domestic use that would affect water
pressure needed for fire protection per structure.
[3]
Plans for and use of sprinkler systems per structure.
[4]
Effect of all proposed systems on existing systems.
(4)
The following information shall be supplied in a combination
of drawn plans and written materials, for all on-site water supply,
distribution and/or sewage facilities.
(a)
All applicable specifications cited in this chapter, and any
other ordinances of Westtown Township, shall be clearly demonstrated,
including types of materials and equipment to be used.
(b)
Plans for placement of all wells and sewage systems shall be
clearly shown for verification of safe sewage disposal.
(c)
Verification shall be shown that all wells shall be double cased,
group sealed into bedrock, at least 50 gallons per minute based on
a twenty-four-hour pump test of potable drinking water.
(5)
Verification shall be shown as to the potability and chemical
makeup of the water supply in accordance with standards set by the
Chester County Health Department.
(6)
The following information shall be supplied in a combination
of drawn plans and written material for all central water supply,
distribution and/or sewage facilities:
(a)
All applicable specifications cited in this chapter shall be
clearly demonstrated, including types of materials and equipment to
be used.
(b)
Complete information on the water/sewer company(ies) shall be
supplied, including:
[1]
Name and location of company.
[2]
Description of other users, including data on franchise area,
acreage, uses and number of units served.
(c)
Complete description of company(ies) existing system, including
location and size of mains, storage, wells and sewage facilities in
the area.
(d)
Complete description of proposed system and facilities within
the tract.
(e)
Complete description of projected expansion of the company(ies)
services within the next five years.
(f)
Verification of monitoring and maintenance services of the company(ies)
in reference to drawdown, well(s) and storage capacity(ies).