The City Council has determined that it is in the best interest of the residents of the City that a Fee Schedule is established that lists items that fees shall be charged for by the City of Isanti.
[HISTORY: Adopted by the City of Isanti 4-7-2020 by Ord. No. 727[1]; amended in its entirety 12-21-2021 by Ord. No. 765. Subsequent amendments noted where applicable.]
[1]
Editor's Note: This ordinance also repealed former Ch. 160, adopted 2-19-2008 by Ord. No. 429, as amended.
[Amended 12-6-2022 by Ord. No. 780; 6-20-2023 by Ord. No. 791; 9-19-2023 by Ord. No. 797; 12-5-2023 by Ord. No. 799; 5-7-2024 by Ord. No. 809; 12-17-2024 by Ord. No. 823; 1-6-2025 by Ord. No. 831; 4-1-2025 by Ord. No. 837; 12-16-2025 by Ord. No. 840]
A.
Administration.
(1)
Administrative hearing filing fee: $75.
(2)
Adult use fee: $2,500.
(3)
Adult use investigation fee: $300.
(4)
Affidavit of candidacy: $15.
(5)
Cannabinoid registration: $125.
(6)
Cannabis registration:
(a)
Cannabis Microbusiness: no fee.
(b)
Cannabis Mezzobusiness: $500.
(c)
Cannabis Cultivator: $500.
(d)
Cannabis Manufacturer: $500.
(e)
Cannabis Retailer: $500.
(f)
Cannabis Wholesaler: $500.
(g)
Cannabis Transporter: $250.
(h)
Cannabis Testing Facility: $500.
(i)
Cannabis Delivery Service: $250.
(j)
Cannabis Event Organizer: no fee.
(k)
Lower-Potency Hemp Edible Manufacturer: $500.
(l)
Lower-Potency Hemp Edible Retailer: $125.
(m)
Lower-Potency Hemp Edible Wholesaler: $500.
(n)
Medical Cannabis Combination Business: $500.
(7)
Cannabis registration renewal:
(a)
Cannabis Microbusiness: $1,000.
(b)
Cannabis Mezzobusiness: $1,000.
(c)
Cannabis Cultivator: $1,000.
(d)
Cannabis Manufacturer: $1,000.
(e)
Cannabis Retailer: $1,000.
(f)
Cannabis Wholesaler: $1,000.
(g)
Cannabis Transporter: $500.
(h)
Cannabis Testing Facilitv: $1,000
(i)
Cannabis Delivery Service: $500
(j)
Cannabis Event Organizer: no fee
(k)
Lower-Potency Hemp Edible Manufacturer: $500
(l)
Lower-Potency Hemp Edible Retailer: $125
(m)
Lower-Potency Hemp Edible Wholesaler: $1,000
(n)
Medical Cannabis Combination Business: $1,000
(8)
Copies - standard printed: $0.25 per page.
(9)
Copies - large format printed: $5 per page; $20 per plan set.
(10)
Copies - USB drive: $5.
(11)
Dog bite: actual cost including containment.
(12)
Dog boarding (at impound): per contract.
(13)
Dog impound 1st time: per contract.
(14)
Dog impound 2nd time: per contract.
(15)
Dog impound 3rd time: per contract.
(a)
Additional fee for pickup (7:00 p.m. - 8:00 a.m. and holidays): per contract.
(16)
Euthanasia/disposal: actual cost.
(17)
FAX - in: $0.25 per page.
(18)
FAX - out: $0.25 per page.
(19)
Gambling permits - application and gambling investigative fee: $50.
(20)
Investigation/background fee: $35.
(21)
Kennel license (commercial): $100 per year.
(22)
Kennel license (residential): $50 per year.
(23)
Mowing abatement: per mowing contract.
(24)
Noncompliance fee: $25.
(25)
Notary: $5 per document.
(26)
Pawnbroker/shop: $1,500.
(27)
Pawnshop investigation fee; initial application only, does not apply to renewal: $1,500.
(28)
Pawnshop transaction fee: $1.30.
(30)
Peddler investigation fee: $35.
(31)
Peddler license and investigation fee - nonprofit: no charge.
(32)
Retail fireworks permit - application fee: $15.
(33)
Retail fireworks permit - permit fee: $25.
(34)
Returned checks: $30.
(35)
Secondhand goods dealer: $1,500.
(36)
Secondhand goods dealer investigation fee; initial application only, not for renewals: $1,500.
(37)
Secondhand goods dealer, temporary: $750.
(38)
Secondhand goods dealer transaction fee: $1.30.
(41)
Small cell wireless/pole attachment permit fee: $250 plus actual engineering costs if additional review is required.
(42)
Special assessment fee; unpaid utility bills, code enforcement violations, etc.: $30 per assessment.
(43)
Special meeting request: $500.
(44)
Special vehicle permit: $25.
(45)
Staff time (not specified elsewhere): actual hourly wage multiplied by 145%.
B.
Building permits and inspections.
(1)
Table 1: Valuation fee schedule. Permit and inspection fees for residential building, commercial building, fire suppression, fire alarm, commercial mechanical, and commercial plumbing. The minimum fee for processing these permits is $75.
Value of Work | Fee |
|---|---|
$0 to $2,000 | $75 |
$2,001 to $25,000 | $83.50 for first $2,000 + $16.55/each additional $1,000 or fraction thereof, to and including $25,000 |
$25,001 to $50,000 | $464.15 for first $25,000 + 12/each additional $1,000 or fraction thereof, to and including $50,000 |
$50,001 to $100,000 | $764.15 for first $50,000 + $8.45/each additional $1,000 or fraction thereof, to and including $100,000 |
$100,001 to $500,000 | $1,186.65 for first $100,000 + $6.75 each additional $1,000 or fraction thereof, to and including $500,000 |
$500,001 to $1,000,000 | $3,886.65 for first $500,000 + $5.50/each additional $1,000 or fraction thereof, to and including $1,000,000 |
$1,000,001 + | $6,636.65 for first $1,000,000 + $4.50/each additional $1,000 or fraction thereof |
(2)
Plan review fees.
(a)
Table 2: Miscellaneous plan review fees.
Type of Plan Review | Fee |
|---|---|
Minimum plan review fee | $50 |
Plan review for building, fire suppression, and fire alarm permits | Refer to Table 1.A 65% plan review may apply. |
Plan review for all commercial mechanical permits | 10% of permit fee for project valuation over $30,000 |
Plan review for similar plans | Set forth in Minnesota Rules 1300.0160 |
In the event an applicant submits an application that requires plan review and decides not to proceed with the building project after the plan review has been completed, the plan review fee will be billed by the jurisdiction to the permit applicant.
(b)
Table 3: Plumbing plan review. Plumbing system plans and specifications that are submitted to the City of Isanti for review shall be accompanied by the appropriate plan examination fees, which shall be paid prior to plan approval. The City of Isanti shall charge the following fees for plan reviews and audits of plumbing installations for public, commercial, and industrial buildings:
Systems with both water distribution and drain, waste and vent systems and having: | |
25 or fewer drainage fixture units | $150 |
26 to 50 drainage fixture units | $250 |
51 to 150 drainage fixture units | $350 |
151 to 249 drainage fixture units | $500 |
250 or more drainage fixture units | $3 per drainage fixture unit to a maximum of $4,000 |
Interceptors, separator, or catch basins | $70 per interceptor, separator, or catch basin design |
Building sewer service only | $150 |
Building water service only | $150 |
Building water distribution system only, no drainage system | $5 per supply fixture unit or $150, whichever is greater |
Storm drainage system | A minimum fee of $150 or $50 per drain opening, up to a maximum of $500 and 70 per interceptor, separator, or catch basin design |
Manufactured home park or campground, 1 to 25 sites | $300 |
Manufactured home park or campground, 26 to 50 sites | $350 |
Manufactured home park or campground, 51 to 125 sites | $400 |
Manufactured home park or campground, more than 125 sites | $500 |
Revision to previously reviewed or incomplete plans: | |
Review of plans for which the City has issued 2 or more requests for additional information, per review | $100 or 10% of the original fee, whichever is greater |
Proposer-requested revision with no increase in project scope | $50 or 10% of original fee, whichever is greater |
Proposer-requested revision with an increase in project scope | $50 plus the difference between the original project fee and the revised project fee |
(c)
State surcharge on building, mechanical, and plumbing permits. In addition to the permit fees established in this fee schedule, a surcharge fee shall be collected on all permits issued for work governed by the Minnesota State Building Code in accordance with Min. Stat., § 326B.148.
(d)
Refunds. The jurisdiction may refund up to 80% of the permit fees in which no work has been done and no inspections have been made. Requests for refunds must be made by the permit applicant in writing within 180 days of issuance. Within 10 business days of receipt, the Contractor must review the refund request and determine the amount to be refunded or deny the refund request for cause. No refunds will be approved or granted for the following: plan review fees, re-inspection fees, or any other services that have previously been rendered.
(e)
Work without a permit. Work commenced without a permit may result in additional fees as specified in Minnesota Rules 1300.0160, Subpart 8. Investigative fees are identified in Table 6 of this Fee Schedule.
(f)
Validity, expiration and suspension or revocation of permits. The validity, expiration, and suspension or revocation of permits shall be as provided by Minnesota Rules 1300.0120, Subparts 10, 11, and 12.
(3)
Table 4: Residential Mechanical permit fees for structures regulated under the MN Residential Code.
Permit | Fee |
|---|---|
New construction mechanical (includes HVAC system, mechanical ventilation system and gas lines) | $125 per unit |
Addition, alteration, remodel or replacement | $100 |
Basement finish mechanical | $100 |
Fireplace | $100 |
Garage Heater | $100 |
Gas Lines | $100 |
Miscellaneous mechanical appliance | $100 |
All other minor mechanical work | $100 |
Furnace, fireplace, air conditioner units, garage heater, gas lines, miscellaneous mechanical appliance, or other minor mechanical work installed and inspected, simultaneously | $157 per dwelling unit |
(4)
Table 5: Residential Plumbing Permit fees for structures regulated under the MN Residential Code.
Permit | Fee |
|---|---|
New construction plumbing | $125 per dwelling unit |
Addition, alteration, remodel or replacement | $100 |
Basement finish | $100 |
Water heater | $112 |
Water conditioning system | $112 |
Miscellaneous plumbing fixtures | $112 |
Municipal sewer connection | $87 |
Municipal water connection | $87 |
Sewer or waterline repair | $102 |
Irrigation system | |
Backflow prevention | |
Water heater, water conditioning system, municipal sewer connection, municipal water connection, irrigation system, backflow prevention, or minor plumbing work installed and inspected simultaneously installed and inspected simultaneously | $167 |
(5)
Table 6: Other permits and fees.
Permit | Fee |
|---|---|
Residential Accessory structure > 200 square feet | Refer to Table 1. A 65% plan review may apply. Max fee $850 includes plan review. |
Structure additions, alterations | Refer to Table 1. A 65% plan review may apply. |
Structure remodel | Refer to Table 1. A 65% plan review may apply |
Basement finish* | $150 |
Deck | A 65% plan review may apply |
Fence over 7 feet high | Refer to Table 1. A 65% plan review may apply |
Fence over 7 feet high | Refer to Table 1. A 65% plan review may apply |
Residential roofing | $102 |
Residential Siding | $102 |
Residential window/door replacement (same size) | $102 |
Commercial demolition | Refer to Table 1. A 65% plan review may apply |
Residential demolition | $150 A 65% plan review may apply |
Manufactured home setup (foundation and connections only) | $175 |
Solar/photovoltaic systems residential (up to 3.5kW) | $175 |
Solar/photovoltaic systems residential (over 3.5kW) | Refer to Table 1. A 65% plan review may apply |
Solar/photovoltaic systems commercial | Refer to Table 1. A 65% plan review may apply |
Association, commercial, industrial, multifamily irrigation system | Refer to Table 1. A 65% plan review may apply |
Miscellaneous commercial or residential building permits for which no fee is specifically indicated | Refer to Table 1. A 65% plan review may apply |
Temporary heating equipment | $150 |
Inspections which no fee is specifically indicated | $125 per hour |
Additional plan review required by changes, additions, or revisions to previously approved plans | $95 per hour (minimum charge of 1 hour) |
Reinspection fees | $95 per hour/inspection, whichever is greater (minimum charge of 1 hour) |
Inspections outside of normal business hours | $150 per hour (minimum charge of 2 hours) |
Change of use/occupancy | Refer to Table 1. A 65% plan review may apply |
In-ground pool | Refer to Table 1. A 65% plan review may apply |
Investigative review | 100% of permit fee |
Temporary certificate of occupancy | Residential $250, Commercial $450 |
Septic system — residential new or replacement | $350 |
Septic system — commercial new or replacement | Refer to Table 1. A 65% plan review may apply |
Septic system — tank replacement/holding tank | $175 |
Operating permit | $200 annually |
Maintenance/pumping permit | $10/triennial |
*Basement finishes that have rough-in and final inspections conducted concurrently (covering framing, insulation, mechanical, plumbing and building aspects) will be charged a $150 permit fee plus 65% plan review. Separate permits for mechanical and plumbing. Additional inspections will be subject to reinspection rates.
(6)
Table 7: Rental licensing fees.
Biennial Inspection and Fee | |
|---|---|
Condo | $150 per dwelling unit |
Single family | $250 per dwelling unit |
Duplex | $300 per building |
Triplex | $450 per building |
Multifamily (4+ units) | $250 per building + $25 per unit |
Reinspection fee for multi-family | $95 per hour/inspection - whichever is greater (one-hour minimum charge) |
1 to 15 days late fee for all licenses | 50% of license fee |
16+ days late fee for all licenses | 100% of license fee |
Point of conversion fee (existing homes converting to a rental property) | $500 |
(7)
Table 8: Engineering reviewed work fees.
Commercial City sewer/water connection | Actual engineering cost |
Grade survey check | $50 |
Right-of-way work | Actual engineering cost |
Single residential hookup | No fee |
Base fee — up to 1,000 LF | $125 |
Fees in addition to base fee; work > 1,000 LF | $65 per LF |
Street cut | $125 plus $5,000 in escrow |
ROW unauthorized work | $250 plus up to double the permit fee |
(8)
Table 9: Escrow fees.
Driveway | $3,000 |
Landscape | $6,000 |
(9)
Table 10: Electrical inspection fees.
All Services Residential Service Change $130, this includes one inspection. Or the below rates. | Circuits and Feeders The inspection fee for the installation, addition, alteration, or repair of each circuit, feeder, feeder tap, or set of transformer secondary conductors: | ||
|---|---|---|---|
0 to 300 amp | $55 | 0 to 30 amp | $12 |
400 amp | $63 | 31 to 100 amp | $12 |
500 amp | $77 | 101 to 200 amp | $20 |
600 amp | $91 | 300 amp | $26 |
800 amp | $119 | 400 amp | $32 |
1,000 amp | $147 | 500 amp | $38 |
1,100 amp | $161 | 600 amp | $44 |
1,200 amp | $175 | 700 amp | $50 |
Add $15 for each additional 100 amps | Add $5 for each additional 100 amps | ||
Minimum permit fee is $65 plus $1 state surcharge. This is for one inspection only. Minimum fee for rough-in inspection and final is $130 plus $1 state surcharge. | |||
Maximum fee for single-family dwelling not over 200 amps is $200 plus $1 state surcharge. Maximum of 30 circuits. Maximum of 2 rough-in inspections and one final inspection. | |||
Apartment buildings | Maximum fee per unit of an apartment or condominium complex is $130. This does not cover service and house wiring. A separate permit must be issued for house wiring. | ||
Swimming pools | $130, this includes two inspections | ||
Traffic Signals | $10 per each standard | ||
Streetlighting | $5 per each standard | ||
Transformers/generators | $10 per unit + $0.50 per KVA | ||
Retro fit lighting | $0.75 per fixture | ||
Sign transformer | $10 | ||
Remote control/signal circuits | $1 per device | ||
Reinspection fees | $65 | ||
*Fees are doubled if the work starts before permit is issued. |
(10)
Table 11: Residential Permit Calculator. Building Valuation Data Table for Projects Not Included in the International Code Council's or Minnesota Department of Labor & Industry's Building Valuation Data Tables.
Permit | Value Per Square Foot |
|---|---|
Slab on Grade | $17 |
Crawl space | $22 |
Main/First Floor Area | $150 |
Second Floor Area | $125 |
Attached garage | $75 |
Detached garage | $60 |
Post and beam accessory structure, unfinished shell | $25 |
Post and beam accessory structure, interior finish | $60 |
Lean-to | $25 |
Carport/gazebo | $50 |
Garage conversion to a living space | $75 |
Porch, open | $55 |
Porch, 3-season | $130 |
Porch, 3-season existing deck | $100 |
Porch, screen porch or breezeway | $90 |
Solarium | $145 |
Deck, screen-in and roof over existing | $50 |
In-ground pool | $40 |
Aboveground pool | $15 |
Masonry fireplace | $34,275.64 |
Remodel, repair, alteration or other | Depends on scope and project |
C.
Community Center.
(1)
Cleaning fee (if elected by renter): $250.
(2)
Damage deposit: $250.
(5)
Rental fees:
Group and Size | Full Day | 4 Hour (or less) |
|---|---|---|
Private event < 50 people | $170 | $85 |
Non-profit event | $75 | $35 |
Private event open to the public | $375 | N/A |
Private event > 50 people | $375 | N/A |
4-hour rentals must include setup and cleanup time. Non-profit organizations must provide Certificate of Exemption. | ||
(6)
Rental fees-monthly:
Fee Arrangements - When Requested |
Nonprofit Monthly Rental Rates (less-than-four-hour rentals) |
Nonprofit** |
Reservations Per Month | Monthly Fee | Fee Per Reservation |
|---|---|---|
1 | $25 | $25 |
2 | $48.80 | $24.40 |
3 | $71.70 | $23.90 |
4 | $93.20 | $23.30 |
5 | $113.50 | $22.70 |
6 | $133.20 | $22.20 |
7 | $151.20 | $21.60 |
8 | $168 | $21 |
9 | $184.50 | $20.50 |
10 | $199 | $19.90 |
11 | $212.30 | $19.30 |
12 | $225.60 | $18.80 |
13 | $236.60 | $18.20 |
14 | $246.40 | $17.60 |
15 | $255 | $17 |
16 | $264 | $16.50 |
17 | $270.30 | $15.90 |
18 | $275.40 | $15.30 |
19 | $281.20 | $14.80 |
20 | $284 | $14.20 |
21 | $285.60 | $13.60 |
22 | $288.20 | $13.10 |
23 | $287.50 | $12.50 |
** | Groups storing belongings at the facility may be subject to a monthly storage fee. | |
Fee Arrangements - When Requested |
For-Profit and Private Monthly Rental Rates (less-than-four-hour rentals) |
Private/For-Profit** |
Reservations Per Month | Monthly Fee | Fee Per Reservation |
|---|---|---|
1 | $50 | $50 |
2 | $97.80 | $48.90 |
3 | $143.10 | $47.70 |
4 | $186.40 | $46.60 |
5 | $227.50 | $45.50 |
6 | $265.80 | $44.30 |
7 | $302.40 | $43.20 |
8 | $336 | $42 |
9 | $368.10 | $40.90 |
10 | $398 | $39.80 |
11 | $424.60 | $38.60 |
12 | $450 | $37.50 |
13 | $473.20 | $36.40 |
14 | $492.80 | $35.20 |
15 | $511.50 | $34.10 |
16 | $528 | $33 |
17 | $540.60 | $31.80 |
18 | $552.60 | $30.70 |
19 | $560.50 | $29.50 |
20 | $568 | $28.40 |
21 | $573.30 | $27.30 |
22 | $574.20 | $26.10 |
23 | $575 | $25 |
** | All other fees and deposits for the rental of the facility apply. | |
D.
Economic Development Authority.
(1)
Assignment and assumption agreement: $1,000 plus costs.
(2)
Conduit debt escrow: 1/4% of the proposed issuance amount, $3,000 minimum, $25,000 maximum escrow.
(3)
Development agreement (nonabatement or TIF): $1,000 plus costs.
(4)
Establishment of new TIF District: $4,800 or actual cost.
(5)
Host approval of conduit debt: $3,000 escrow.
(6)
Revolving loan fund application fee: 1% origination fee.
(7)
SAC/WAC repayment agreement and mortgage: current cost of filing document(s) at Isanti County to be paid by developer.
(8)
TIF development agreement: $2,500 plus costs.
(9)
Tax abatement application fee: $1,000 plus costs.
E.
Liquor/beer licenses.
(3)
Beer off-sale (3.2): $150.
(4)
Beer on-sale (3.2): $250.
(5)
Brewers off-sale malt liquor: $310.
(6)
Brewers tap room on-sale: $500.
(7)
Brew pub off-sale malt liquor: $310.
(8)
Club license (max dictated by Minnesota State Statutes): $500.
(9)
Intoxicating liquor on-sale: $2,500.
(10)
Intoxicating liquor Sunday on-sale: $200.
(11)
Consumption and display permit (annual): $200.
(12)
Temporary consumption and display permit: $25.
(13)
Temporary on-sale 3.2 beer license (one day to four days): $50.
(14)
Temporary one-day on-sale intoxicating liquor license: $25.
(15)
Temporary on-sale intoxicating liquor license (includes beer and wine, two days to four days one event): $50.
F.
Parks and Recreation.
(1)
Bluebird Amphitheater.
(a)
Full-day rental: $350.
(b)
Full-day rental - nonprofit: $175.
(c)
Half-day rental: $150 (four hours or less).
(d)
Half-day rental - nonprofit: $75 (four hours or less).
(e)
Refundable damage deposit: $250.
(f)
Speakers w/ tripod (two): $25.
(g)
Microphone: $10.
(h)
Podium: $15.
(i)
Damage cleaning fee: $75 per hour.
(j)
Stains/structural damage fee: $75 per hour.
(k)
Other damage fee: based on replacement cost.
(2)
Printed copy of Comprehensive Park Plan: $10.
(3)
Community garden - ground plot (season fee): $15.
(4)
Community garden - raised bed (season fee): $20.
(5)
Park dedication fee (residential): $1,800 per unit.
(6)
Park dedication fee - multifamily with recreational amenities: up to 10% reduction of $1,800 per-unit fee.
(7)
Park dedication fee (all others): $1,800 per commercial/industrial acre.
(8)
Park shelter electric box deposit: $50.
(10)
Special event cleanup deposit: $100.
G.
Planning and zoning.
(1)
Administrative appeals: $200 plus costs.
(2)
Administrative permit: $75.
(3)
Administrative permit - nonprofit: no charge.
(4)
Administrative subdivision: $275 plus costs.
(5)
Annexation/de-annexation: $100 plus costs.
(6)
City utility services under driveway: $100.
(7)
Comprehensive Plan amendment: $325 plus costs.
(8)
Conditional use permit: $325 plus costs ($1,000 escrow).
(9)
Conditional use permit amendment: $275 plus costs ($500 escrow).
(10)
Copy of Comprehensive Plan: $50.
(11)
Copy of Zoning Ordinance: $25.
(12)
Copy of engineer design standards: $35.
(13)
Development agreement: $10,000 (minimum) escrow.
(14)
Development agreement (minor): $5,000 (minimum) escrow.
(15)
Easement application: $200 plus costs.
(16)
EAW and EIS review: $600 plus costs.
(17)
Final plat: $325 plus $10 per lot/unit plus costs ($1,500 escrow).
(18)
Grading permit: $150 plus escrow if required.
(19)
Interim use permit: $325 plus costs.
(20)
Minor subdivision plat: $325 plus costs ($1,000 escrow).
(21)
Planned unit development - final plan: $325 plus costs ($1,500 escrow).
(22)
Planned unit development - general plan: $500 plus costs ($1,500 escrow).
(23)
Preliminary plat: $500 plus costs ($1,500 escrow).
(24)
Rezoning request: $325 plus costs.
(25)
Sediment and erosion control inspection, residential: $20.
(26)
Sediment and erosion control inspection, commercial: $50.
(27)
Sign permit (permanent): $75.
(28)
Sign permit (temporary): $50.
(29)
Sign permit for nonprofit (temporary): no charge.
(30)
Site plan review: $325 plus costs ($1,000 escrow).
(31)
Site plan review financial surety: 125% of estimated cost of site (commercial/industrial) improvements (driveway, parking and loading areas).
(32)
Text amendment: $275.
(33)
Vacation request: $275 plus costs.
(34)
Variance request: $325 plus costs.
(35)
Wetlands replacement plan review: $500.
(36)
Zoning investigative fee: 100% of permit.
(37)
Zoning permits: $80.
(38)
Zoning staff inspection (additional): $55 per hour (1/2 hr. min.).
(39)
Zoning verification letter: $30.
H.
Police.
(1)
Administrative citation: $60.
(2)
Alcohol screening: $3 per time or $75 per year.
(3)
Chemical disposal (small amount): cost of disposal.
(4)
Chemical disposal (large amount): cost of disposal.
(5)
Cleaning of crime scene: cost of cleanup.
(6)
Copy of photo: $5.
(7)
Copy of police report: $0.25 per page.
(8)
Copy of video and/or audio, or secured e-delivery: $25, each additional video $10.
(9)
Fee for returned check: listed under Administration.
(10)
Fingerprinting: $15 per nonresident or non-Isanti business, $0 for Isanti resident or business.
(11)
Police records search: $35.
(12)
Professional hire of police officer (minimum three hours): actual hourly wage multiplied by 150%.
(13)
Reschedule hearing on administrative citation: $50.
(14)
Storage fees: $20 per day.
(15)
Towing: As per towing contract fee schedule.
(16)
Unjust hearing: 150% of cost of hearing.
I.
Sewer and water.
(3)
Meter connections/fittings: actual cost.
(4)
Meter replacement administrative fee for noncompliance: $75/month.
(5)
Private metered - bulk water sales: $10 minimum and up to the first 1,000 gallons: as per rate study per/1,000 thereafter plus required refundable deposit to cover actual cost of meter and backflow preventer deposit: $2,000 (refundable deposit).
(6)
Private well water testing: $50.
(7)
Sewer access fee (SAC): per ordinance per unit based on REC assessment.
(8)
Sewer rates: per ordinance.
(9)
Stormwater rates: per ordinance.
(10)
Stormwater escrow commercial: $3,000.
(11)
Stormwater escrow residential: $1,000.
(12)
Trunk utility charge residential: $1,000/unit if more than one unit based on REC schedule or per development agreement.
(13)
Trunk utility charge commercial/industrial: $2,050 per commercial/industrial acre or per development agreement.
(14)
Valve plate cover: $115.
(15)
Water access charge (WAC): per ordinance per unit based on REC assessment.
(16)
Water disconnect/reconnect during work day hours 8:00 a.m. – 3:00 p.m.: no charge.
(17)
Water disconnect/reconnect (after hours): $100 minimum per person, after one hour $100 per hour per person.
(18)
Water meter history report: no charge.
(19)
Water meter testing: one hour public works staff plus costs.
(20)
Water rates: per ordinance.
J.
Streets.
(1)
Bobcat/tractor: $100 per hour.
(2)
Labor/operator - during work hours: $75 per hour, 1/2 hour minimum.
(3)
Labor - after hours: $150 per hour, two-hour minimum.
(4)
Sidewalk snow removal: $30.
(5)
Street cut permit: $1,200.
(6)
Minnesota WARN rates: equipment charges are per hour with operator:
Business Hours | Non-Business Hours | |
|---|---|---|
Road Grader with Wing, Dump Truck with Snowplow and Wing, Wheel Loader | $160 | $180 |
Air Compressor with Accessories and Pickup, Pickup, One-Ton Trucks, Tractors | $90 | $110 |
Vactor with Pickup (Requires Two Operators); there is an additional charge of $0.35 per lineal foot for sewer cleaning. | $135 | $145 |
Single-axle Truck, Street Sweeper, Single-axle Dump Truck with Snowplow | $125 | $145 |
Skidsteer, Self-propelled Mower/Snowblower/V Plow/Broom/Brush Hog/Grapple Bucket Attachment | $90 | $105 |
All Other Equipment Such As Chain Saw, Push Mower and Weed Whips | $75 | $95 |
This is not an all-inclusive fee schedule for fees that may be charged by the City. The City Council is solely responsible for the setting and establishment of fees, whether listed in this chapter or in an ordinance, a resolution or negotiated in an agreement. Sales and use tax applied in addition to fees as required by state statute.
The City Council authorizes this chapter to be published in summary form, with copies of the fee schedule available to the public at City Hall at no charge.