A.
All survey work shall be done under the direction of a registered professional engineer or land surveyor.
B.
After clearing and grubbing there shall be a certified center line witnessed along the right-of-way at fifty-foot intervals, and the proposed finished grades shall be marked thereon. Before any lots are built upon, the corners of the lots shall be witnessed. The aforementioned witness stakes shall be preserved throughout all the construction procedures.