A.
Building/use permit.
(1)
No building shall hereafter be erected, relocated or altered as to outside dimensions or so as to permit a change in its use and no excavation for any building shall be begun unless and until a permit therefor has been issued by the Code Enforcement Officer, or Upon authorization of the Board of Appeals, wherever it is provided in this chapter that the approval of the Board of Appeals is required.
(2)
No such permit shall be issued until there has been filed with the Code Enforcement Officer a sketch or plot plan showing the actual dimensions and angles of the lot to be built upon, the exact size and location on the lot of the building or accessory building to be erected, relocated or altered and such other information as may be necessary to provide for the enforcement of this chapter. Each application shall state the purpose for which the structure or land is to be used and a general description of the type of construction.
B.
The Code Enforcement Officer shall issue or refuse to issue such permits, all within a reasonable time. Notice of refusal to issue any permit shall be given to the owner or to his authorized representative, in writing, and shall state the reasons for said refusal. The fee for any such permit shall be as determined by the Village Board from time to time.
C.
Certificate of compliance. No land shall be used or occupied and no building hereafter erected, altered or extended shall be used or changed in use until a certificate of compliance shall have been issued by the Code Enforcement Officer. A certificate of compliance shall be issued only if the proposed use of the building or land conforms to all of the provisions of this chapter and the New York State Uniform Fire Prevention and Building Code, the plot plan and the purpose and description for which the permit was issued. The Code Enforcement Officer shall make or cause to have an inspection of each building or lot for which a certificate of compliance is required before issuing such certificate after approval of the Planning Board or Zoning Board of Appeals when applicable. Such inspection shall be made within 10 days from the day of the notification of project completion.
[Amended 9-11-1994 by L.L. No. 1-1994]
D.
All property must comply with existing law before additional applications required by this chapter will be approved. A nonconforming use is exempted.
[Added 9-11-1994 by L.L. No. 1-1994]