This chapter shall be known as the "Schedule of Fees for the Town of Conesus, County of Livingston, State of New York."
[HISTORY: Adopted by the Town Board of the Town of Conesus 11-19-2002 by L.L. No. 3-2002; as amended through 5-10-2016. Subsequent amendments noted where applicable.]
GENERAL REFERENCES
Animals — See Ch. 52.
Building construction and fire prevention — See Ch. 59.
Erosion and sediment control — See Ch. 79.
Flood damage prevention — See Ch. 87.
Subdivision of land — See Ch. 134.
Windmills and energy-conversion systems — See Ch. 149.
Wireless service facilities — See Ch. 151.
Zoning — See Ch. 155.
The Town of Conesus, recognizes the need to review and revise certain fees previously adopted dealing with zone changes, special or conditional use permits, site plan applications, preliminary plat applications, building code inspections, department fees, and certain other fees relating to Town services incurred for engineering, legal and administrative costs. The Town of Conesus intends herein to establish a schedule of fees for such various services and to incorporate the same within the provisions of this chapter.
It is the intent of the Town of Conesus, by the enactment of this chapter establishing a schedule of fees for various services performed by Town departments and personnel, to rescind and repeal any and all resolutions and regulations previously adopted that pertains in any way to the fees hereinafter set forth.
A.
Office of Town Clerk.
Document | Fee | |
|---|---|---|
Zoning Map (8 1/2 by 11) | $0.25 | |
Copies, per page | $0.25 | |
Fax service | $1.50 | |
Certification of documents | $10 |
B.
Code Enforcement Department.
Permit Type | Description | Per Square Feet | Minimum | |
|---|---|---|---|---|
Single-family dwelling | Including additions, alterations and manufactured/mobile homes | 0.23 | $75 | |
Two-family dwelling | 0.25 | $100 | ||
Multifamily dwelling (3 or more) | Including additions and alterations | 0.25 | $100 | |
Foundation and crawl space permits | Additions | $50 | ||
New homes | $150 | |||
Commercial | $300 | |||
Commercial (renovations are 75% of permit cost) | 0.25 | $150 | ||
Large project surcharge (over $500,000) | .003 times project cost | |||
Sprinkler permit | $100 | |||
Construction trailer | $200 | |||
Dumpster enclosure | $150 | |||
Truss identification labels (per NYS Title 19) | $50 | |||
Temporary structure/tent permit (over 400 square feet) | Commercial/ nonresidential | $100 | ||
Not-for-profit permit required | No fee | |||
Accessory buildings | Garage | 0.18 | $50 | |
Accessory building up to 170 square feet (zoning permit) | $35 | |||
Accessory building over 170 square feet | 0.18 | $45 | ||
Agricultural building flat fee | $30 | |||
Porch/deck and handicap ramp (larger than 16 square feet) | 0.15 | $35 | ||
Wind mills and energy devices special use permits | Residential | $75 | ||
Commercial | $1,000 | |||
Wireless service facilities special use permits | $500 | |||
Updates/changes to facilities | $125 | |||
Chimney, fireplace, solid fuel or gas log | $75 | |||
Furnace, unvented appliances (new or replacement) | $50 | |||
Outdoor wood | $150 | |||
Replacement hot water tank | $25 | |||
Re-roofs | $50 | |||
Generators | Residential | $100 | ||
Commercial | $200 | |||
Post fire/storm damage | $50 | |||
Erosion control | Residential | $40 | ||
Commercial | $65 | |||
Floodplain permit | Residential | $50 | ||
Commercial | $100 | |||
Fireworks permit (licensed vendor) | $100 | |||
Pools | Inground | |||
Residential | $75 (plus $100 refundable fee on receipt of C of C; fee is nonrefundable after 120 days) | |||
Commercial | $200 (plus $100 refundable fee on receipt of C of C; fee is nonrefundable after 120 days) | |||
Aboveground | $50 (plus $100 refundable fee on receipt of C of C; fee is nonrefundable after 120 days) | |||
Decking for aboveground pool | 0.20 | $50 | ||
Demolition permit | Residential includes sheds, barns and garages | $50 | ||
Commercial | $300 | |||
Renewal of building permits | 1st residential and commercial | 1/2 original permit | ||
2nd and thereafter (both) | Same as original permit | |||
Final certificates of occupancy or certificates of compliance Not under a building permit | Residential-single family | $50 | ||
Residential-double family | $50/unit | $100 | ||
Commercial | $145 | |||
Apartment | $65/unit | |||
Temporary certificate of occupancy - single family 3 temporary certificates of occupancy is the maximum | 1st | $40 | ||
2nd | $65 | |||
3rd | $90 | |||
Temporary certificate of occupancy - multifamily 3 temporary certificates of occupancy is the maximum | 1st | $65 | ||
2nd | $90 | |||
3rd | $120 | |||
Temporary certificate of occupancy — commercial 3 temporary certificates of occupancy is the maximum | 1st | $125 | ||
2nd | $150 | |||
3rd | $175 | |||
Failure to follow building permit inspection schedule or a missed inspection | Failure to schedule/miss 1 inspection | $50 | ||
Failure to schedule/miss 2 inspections | $75 | |||
Failure to schedule/miss 3 or more inspections | $275 | |||
Work started without a building permit based on value of the project | $100 to $2,500 | $50 | ||
$2,501 to $10,000 | $75 | |||
$10,001 to $50,000 | $125 | |||
Over $50,001 | $175 | |||
Stop-work order rescinded | $100 | |||
Compliance letter | $50 | |||
Sign permits (cost = square feet plus min) | Signs up to 20 square feet | $65 | ||
Signs 21 square feet to 30 square feet | 0.75 | $100 | ||
Signs 31 square feet to 50 square feet | 1.00 | $150 | ||
Signs 51 square feet and larger | 1.25 | $250 | ||
Freestanding | 1.50 | $275 | ||
Annual inspection fee (mobile home parks) | Per inspection | $75 | ||
Operating permit/fire inspection | Up to 10,000 square feet | $50 | ||
Each additional 10,000 square feet | $25/per | |||
Code Enforcement Officer hourly rate for meetings | $35/hr | |||
Plan reviews | Residential one- and two-family, garage and farm buildings | $65 | ||
Multiple dwelling | $75 | |||
Commercial | $100 | |||
Application fee for variance, conditional use, special use | $150 | |||
Special use permit | $50 | |||
Adult special use permit | $500 | |||
Plat minor subdivision | $150 | |||
Primary plat major subdivision | $250, plus $100/lot | |||
Final plat major subdivision | $150 | |||
Boundary line change/adjustment subdivision | $100 |
NOTES: | ||
|---|---|---|
* | Applicant/developer is responsible to reimburse the Town in full for all attorney, professional, and engineering fees incurred relative to building or zoning issues | |
C.
Dog license fees.
Permit Type | Fee | |
|---|---|---|
Spayed/neutered dog, per dog | $16 | |
Unspayed/unneutered dog, per dog | $25 | |
Late fee for expired dog registration (over 60 days) | $20 |
Amendments, changes and/or revisions to the above schedule of fees shall be made by resolution of the Town Board of Conesus after conducting a public hearing thereon.