Maintenance. All landscaping materials for a subdivision or land development shall be installed in accordance with the landscaping plan. Final installation of all such landscaping material shall be subject to the approval of the Township Engineer. A maintenance period of 18 months shall be required to assure the proper establishment of all landscaping, during which 15% of the required security shall be retained for the purpose set forth in this article. Improvements security shall include the cost of said materials. During the maintenance period, the developer shall replace dead trees and dead landscaping. If the particular season makes such replacement unfeasible, then it shall be accomplished within a reasonable period of time not to exceed six months thereafter.