This article lists the requirements for final plans for a major subdivision or land development. See the requirements of Article
VII for a project that only involves a minor subdivision or only a boundary line adjustment.
[Amended 3-6-1995 by Ord. No. 1-95]
A. All final plan submittals shall include all of the information that was required at the time of preliminary plan submittal (see §
230-30) and the additional information listed below in this section. If specific technical supporting documents, such as stormwater calculations, are identical to those submitted at the preliminary stage, the Township Engineer may waive the requirement to submit additional copies of those items.
B. Additional final plan requirements.
(1) A property survey shall have been performed of the
boundary of the entire tract, and evidence of such survey shall be
presented.
(2) Easements shall be placed on the land providing for:
(b)
All needed utility, drainage maintenance, pedestrian,
open space or other easements, as needed.
(3) Required plan notations. The following wording shall
be required to be placed on any final subdivision or land development
plan, as applicable:
(a)
"If access will be provided onto a state highway,
access to a state highway shall only be provided in compliance with
a PennDOT highway occupancy permit."
(b)
"Well and sewage disposal systems shall be constructed
in accordance with standards of the Pennsylvania Department of Environmental
Protection."
(c)
"Individual owners of lots must receive approval
from the Township sewage enforcement officer for a sewage permit prior to undertaking the
construction of an on-lot sewage disposal system or building that
will need to be served by such a system."
(d)
"The Planning Commission and Board of Commissioners
have not passed upon the feasibility of any individual lot or location
within a lot being able to sustain any type of well or sewage disposal
system."
(4) Streetlighting (if required).
(b)
Spacing of poles and intensity of lamps.
(c)
Proposed method to pay for electricity and maintenance.
(5) Proposed monument locations and types.
(6) Water main sanitary sewer and storm drain plan and
profiles.
(a)
Plan and profile of proposed ground surface
with elevations at top of manholes or inlets.
(b)
Plan and profile of water main, storm sewer
or sanitary sewer lines, showing type and size of pipe, grade, cradle,
manhole, and inlet locations and invert elevations along flow line,
with stationing.
(c)
All line crossings of other utilities.
(d)
Invert elevations along flow line at manholes,
inlets and at line crossing of other utilities.
(7) Construction details (following any applicable Township
standards).
(a)
Typical cross section and specifications for street construction as required by §
230-57 and the Township street and improvement specifications.
(b)
Drainage swale cross section and construction
materials.
(d)
Storm drainage structures, including any detention
including basin outfall structure and spillway.
(e)
Sanitary sewer structures.
(f)
Curb and sidewalk details.
(g)
Street tree planting details.
(h)
Sinkhole and other ground subsidence repair
details.
[Added 1-15-2001 by Ord. No. 1-01]
(8) Street addresses shall be required to be shown on
the final plan of a major subdivision.