During any stage of the project, if the Township Engineer
or his designee determines that the permanent BMPs and/or stormwater
management facilities are not being installed in accordance with the
approved erosion and sediment control and/or stormwater management
plan, the Township may revoke any existing permits or other approvals
and issue a cease and desist order, as specified in this chapter,
until the deficiencies are corrected and approved by the Engineer.