In the event that a person or entity fails to
comply with the requirements of this chapter or fails to conform to
the requirements of any permit issued hereunder, the Township shall
provide written notification of the violation. Such notification shall
state the nature of the violation(s) and establish a time limit for
correction of such violation(s). Failure to comply within the time
specified shall subject such person to the penalty provisions of this
chapter. All such penalties shall be deemed cumulative and shall not
prevent the Township from pursuing any and all possible remedies.
It shall be the responsibility of the owner of the real property on
which any regulated activity is proposed to occur, is occurring, or
has occurred to comply with the terms and conditions of this chapter.
The Township Engineer or designee is hereby
authorized and directed to enforce all of the provisions of this chapter.
A. A set of design plans approved by the Township Engineer
or designee shall be on file at the site throughout the duration of
the construction activity. Periodic inspections may be made by the
Township Engineer or designee during construction.
B. It shall be unlawful for any person or entity to undertake any regulated activity under §
174-7 on any property except as provided for in the approved drainage plan and pursuant to the requirements of this chapter. It shall be unlawful to alter or remove any control structure required by the drainage plan pursuant to this chapter or to allow the property to remain in a condition which does not conform to the approved drainage plan.
C. At the completion of the project, the owner or his
representatives shall provide in writing to the Township Engineer:
(1) A certification of completion from an engineer, architect,
surveyor, or other qualified person verifying that all permanent facilities
have been constructed according to the plans and specifications and
approved revisions thereto; and
(2) A set of as-built (record) drawings.
D. After receipt of the certification, a final inspection
shall be conducted by the Township Engineer or designated representative
to certify compliance with this chapter.
E. An occupancy permit shall not be issued unless the certification of completion pursuant to §
174-39C has been secured. The occupancy permit shall be required for each lot owner and/or applicant for all subdivisions and land developments in the Township.
Any person aggrieved by any action of Tredyffrin Township or its designee, with the exception of the finding of a violation(s) pursuant to §§
174-34 through 41 of this chapter, may appeal to the Township Manager or designee within 30 days of that action.