A.
Within 30 days after passage of this chapter, each user discharging industrial process wastewater to the wastewater system shall be required to obtain a discharge permit and file with the Village Board an industrial wastewater discharge application, to be furnished by the Village Board, which shall supply pertinent data relating to the quantity and characteristics of the waste discharged to the sewerage system. The questionnaire must be signed by an authorized representative of the industrial user.
B.
All permits shall be issued for an unlimited period, subject to amendment or revocations as provided in this chapter.
C.
Similarly, each industrial user desiring to make a new connection or to modify an existing process to the wastewater system shall apply and file with the Village a permit application at least 60 days before desiring such modification or connection and shall include actual or predicted data relating to the quantity and characteristics of the waste to be discharged.