Building subcode fees |
| Minimum fee | |
| | R3/R5 | $80 |
| | All other uses and commercial | $115 |
| New construction, including additions, per cubic foot of volume | $0.053 |
| | Minimum fee for any new principal structure (R5) | $1,200 |
| | Minimum fee for any new accessory structure (R5) | $150 |
| | Minimum fee for additions (R5) | |
| | | 120 square feet or less | $285 |
| | | Greater than 120 square feet | $385 |
| | Modular structure, per $1,000 of cost | $30 |
| Renovations, alterations and repairs | |
| | Up to first $50,000 in cost, per $1,000 | $30 |
| | From $50,001 to $100,000 and over in cost, per $1,000 | $28 |
| | $100,001 and over in cost, per $1,000 | $27 |
| Demolitions | |
| | R5 Use Group, complete | $300 |
| | All other use groups, complete | $700 |
| | Interior demolition, all use groups | $150 |
| | Garage or accessory building demolition, all use groups | $250 |
| Fuel storage tanks, removal or abandon | |
| | Up to 275 gallons | $75 |
| | 276 to 1,000 gallons | $125 |
| | Each additional 500 gallons | $50 |
| Moving a building, per $1,000 of estimated cost of work | $25 |
| Asbestos abatement with administrative certificate | $175 |
| Lead hazard abatement with certificate of clearance | $195 |
| Swimming pools: building permit only | |
| | Aboveground pools | $150 |
| | In-ground pools, per $1,000 of estimated cost | $30 |
| Sheds, per $1,000 of estimated cost | $30 |
| House and construction trailers, each | $150 |
| Tents over 900 square feet or 30 feet in length in 1 direction | $150 |
| Retaining walls 4 feet or more in height, per $1,000 of estimated cost | $30 |
| Signs, per square foot | $7 |
| Certificate of occupancy, U.C.C. | |
| | Residential (new construction or rehabilitation) | $100 |
| | Nonresidential | 10% of permit fee |
| Certificate of continued occupancy, U.C.C., applicant-requested | |
| | General visual inspection by all subcode officials, per subcode | $100 |
| Temporary certificate of occupancy | |
| | Initial issuance | No fee |
| | Subsequent renewals, each | $30 |
| Plan review (nonrefundable percentage of permit fee) | 20% |
| Change of contractor (plus any additional items or cost) | $45 |
| Withdrawn permit (administrative fee: percentage of permit fee) | 30% |
| Reinstatement of lapsed permit fee (percentage of original permit fee) | 80% |
| Permit surcharge | State-mandated; see N.J.A.C. 5:23-4.19(b) |
| Variation application as per N.J.A.C. 5:23-2.10 | |
| | Class I structures | $550 |
| | Class II and Class III structures | $200 |
| | Resubmission, Class I structures | $200 |
| | Resubmission, Class II and Class III structures | $100 |
| Special inspection request for a required code inspection, either before or after regular Building Department hours of business or on holidays and weekends | The current contractual hourly compensation rate (1 1/2 times their normal hourly salary) based on the amount of time required for said inspection, with a 2-hour minimum, in addition to any established permit and certificate fees |
Electrical subcode fees | |
| Minimum fee | |
| | R3/R5 | $80 |
| | All other uses and commercial | $115 |
| Electrical devices (lighting outlets, receptacles, switches, smoke and heat detectors, emergency lights, exit lights, communication points and fire alarm devices) | |
| | 1 to 20 devices | $80 |
| | Each additional 20 devices | $45 |
| | Dishwasher, disposal unit, instant hot, each | $50 |
| | Temporary trailers, each (plus the service) | $60 |
| Motors (all except those in plug-in appliances) | |
| | 1 to 10 horsepower | $58 |
| | 11 to 50 horsepower | $100 |
| | 51 to 100 horsepower | $175 |
| | Greater than 100 horsepower | $450 |
| Transformers/generators/appliance equipment/ovens, ranges, warming trays | |
| | 1 to 10 kilowatts | $55 |
| | 11 to 45 kilowatts | $80 |
| | 46 to 112.5 kilowatts | $120 |
| | Over 112.5 kilowatts | $470 |
| Service entrance, panel, subpanel or disconnect (each) | |
| | Up to 100 amps | $100 |
| | 101 to 200 amps | $120 |
| | 201 to 400 amps | $220 |
| | 401 to 1,200 amps | $560 |
| | Over 1,201 amps | $810 |
| | Additional meters included in service | $35 |
| Air-conditioning units (includes disconnect, compressor/condenser, air handler), each | $100 |
| | Replacement of any system part | $65 |
| Burglar alarm system (complete) | $75 |
| Swimming pools (includes receptacle, switch, trench, bonding and equippotential bonding mat) | $190 |
| | Hydromassage tub (interior) | $60 |
| | Hot tub/spa, exterior (same as a pool) | $190 |
| | Certificate of compliance; annual inspection for public swimming pools, spas and hot tubs | $135 |
Photovoltaic systems | |
| Solar modules | |
| | 1 to 20 modules | $85 |
| | Each additional 20 modules | $45 |
| | 1 to 10 kilowatts | $80 |
| | 11 to 100 kilowatts | $135 |
| | Greater than 100 kilowatts | $600 |
| Disconnects and inverters | |
| | Up to 100 amps, each | $95 |
| | 101 to 200 amps, each | $115 |
EV Charging Station (Each) | $75 |
Elevator subcode fees | 80% of state fees (subject to change by the state pursuant to N.J.A.C. 5:23-12.6), plus 25% administrative fee |
| Elevator plan review | In accordance with N.J.A.C. 5:23-4.20(c)6 and 7 |
Fire subcode fees | |
| Minimum fee | |
| | R3/R5 | $80 |
| | All other uses and commercial | $115 |
| Photovoltaic systems | |
| | R3/R5 | $80 |
| | All other uses commercial | $115 |
| Sprinkler systems, each | |
| | Pipe schedule | $90 |
| | Hydraulically calculated | $90 |
| | R5 Use Group, 20 or fewer heads | $80 |
| Sprinkler system heads, all use groups | |
| | 1 to 20 heads | $90 |
| | 21 to 100 heads | $160 |
| | 101 to 200 heads | $297 |
| | 201 to 400 heads | $760 |
| | 401 to 1,000 heads | $1,060 |
| | Over 1,000 heads | $1,940 |
| Sprinkler system supervisory devices (i.e., tamper switches low/high), each | $35 |
| Standpipes, each | $350 |
| | Dry pipe/alarm valves, each | $85 |
| | Preaction valves, each | $165 |
| | Water service for a fire line | $150 |
| Fire alarm systems | |
| | Control panels, R5 Use Group, each | $80 |
| | Control panels, all other use groups, each | $100 |
| Fire alarm system devices (i.e., smoke detector heads, heat detector heads, pull stations, water flow alarms) | |
| | 1 to 20 devices | $80 |
| | 21 to 100 devices | $140 |
| | 101 to 200 devices | $300 |
| | 201 to 400 devices | $650 |
| | 401 to 1,000 devices | $850 |
| | Over 1,000 devices | $1,200 |
| Fire alarm panel, new installation or replacement | $100 |
| Fire alarm system security devices (i.e., door locks, electromagnetic releases), each | $45 |
| Fire alarm system signaling devices (i.e., horns, strobes, bells), each | $15 |
| Independent preengineered systems, each | |
| | Wet chemical system | $225 |
| | All other systems | $200 |
| Gas- or oil-fired appliances, each | |
| | R5 Use Group | $80 |
| | All other use groups | $115 |
| | Fireplaces | $85 |
| Metal chimney liner | |
| | Residential | $85 |
| | Commercial | $120 |
| Exhaust systems, each | |
| | Commercial kitchen hood | $250 |
| | Smoke control system | $350 |
| Incinerators or crematoriums, each | $375 |
| Fuel storage tanks, installation, each | |
| | Up to 275 gallons | $85 |
| | 276 to 1,000 gallons | $110 |
| | 1,001 gallons to 5,000 gallons | $260 |
| | Over 5,000 gallons | $525 |
| Fuel storage tanks, removal or abandon | |
| | Up to 275 gallons | $80 |
| | 276 to 1,000 gallons | $135 |
| | Each additional 500 gallons | $50 |
| Fire pump, each | $400 |
| Water service for fire line | |
| | Up to 2-inch | $100 |
| | 2 1/2- to 5-inch | $200 |
| | 6-inch or larger | $300 |
Plumbing subcode fees | |
| Minimum fee | |
| | R3/R5 | $80 |
| | All other uses and commercial | $115 |
| Fixtures (i.e., lavatories, kitchen sinks, basins, urinals, water closets, bathtubs, shower stalls, sill cocks, laundry tubs, floor drains, drinking fountains, dishwashers, garbage disposals, clothes washers and similar devices), each | $35 |
| Stacks, each | $60 |
| Special devices (i.e., grease traps, oil separators, refrigeration units, utility service connections, backflow preventers, gas service interceptors, and fuel oil piping), each | $85 |
| Utilization equipment (i.e., steam boilers, hot-water boilers, warm-air furnaces), each | |
| | R5 Use Group | $85 |
| | All other use groups | $110 |
| Air-conditioning units, each | |
| | R5 Use Group | $85 |
| | All other use groups | $95 |
| Water heaters, each | |
| | R5 Use Group | $85 |
| | All other use groups | $115 |
| Gas piping, each | |
| | R5 Use Group | $80 |
| | All other use groups | $90 |
| Vapor recovery systems, each | $100 |
| | Required annual reinspections (i.e., cross-connections, backflow preventers) | $75 |
| Medical gas piping, per outlet | $40 |
| Septic tank removal | $110 |
| Lawn irrigation system (per system) | $85 |
| Annual testing of backflow preventers | |
| | 1 to 4 devices | $75 per device |
| | 5 or more devices | $60 per device |
Zoning | |
| Zoning permit (includes review for use and/or development) | |
| | Initial | $60 |
| | Amended application, each | $35 |
| Sign applications | $100 |
| Certificate for resale of residential and commercial property | |
| | With 2 weeks' notice | $100 |
| | With less than 2 weeks' notice | $150 |
| House resale reinspection | $50 |
| Application fee for outdoor dining (before April 1) | $100 |
| Application fee for outdoor dining (after April 1) | $250 |
| Certificate of use (business) | $225 |
| Lead paint, visual inspection per unit | $220 |
| Lead safe certificate (process from a third party) | $50 |
| Any letter from the Zoning Official for nonconformity, zone clarification, or permitted uses in a particular zone | $100 |
| Engineer's escrow, minimum to be posted when associated with a building permit | $1,000 |
Mechanical subcode fees for R-3 and R-5 Uses |
| (A) Minimum fee | $85 |
| (B) Mechanical plan review | $85 |
| (C) Replacement | |
| | Furnaces, boilers, AC and HVAC units | $85 per unit replaced |
| | Rooftop HVAC units | $140 per unit replaced |
| (D) Installation of aboveground or underground fuel storage tanks | |
| | Up to 275 gallons | $85 per unit |
| | 276 to 1,000 gallons | $110 per unit |
| (E) Fuel oil or gas piping connections | $85 per unit |
| (F) New installations: fireplaces, solid-fuel stoves, boilers, furnaces, AC, HVAC, generators, chimneys and chimney relinings | $85 per unit |
| (G) Each additional unit over the initial (Lines C. D. E, F from above) | $45 per unit |
| (H) Duct systems | $85 per system |
| (I) Metal chimney liner | $85 |
| (J) Water heater | $85 |