A.
A zoning permit shall be required prior to the erection, construction or alteration of any building, structure or any portion thereof.
B.
Applications for zoning permits shall be made in writing to the Zoning Officer and shall contain all information necessary for such officer to ascertain whether the proposed erection, construction, alteration or use complies with the provisions of this chapter.
C.
Such permits shall be granted or refused within 10 days from the date of application. Failure to grant or refuse a permit within this time period shall constitute approval by the Township.
D.
No zoning permit shall be issued by the Zoning Officer unless it is in conformity with the regulations of this chapter, or after written order from the Zoning Board of Adjustment or by order of the courts.
E.
Application for a zoning permit shall be accompanied by plans in duplicate drawn to scale and showing the following:
(1)
Actual dimensions and shape of the lot to be built upon;
(2)
Exact size and locations on the lot of all existing buildings and other structures, if any, and the location and dimensions of proposed buildings and other structures or alterations;
(3)
All existing and proposed uses of said structures, including showing the number of families the building is designated to accommodate; and
(4)
Any other lawful information that may be required by Township ordinances, such as grading plans.
F.
No zoning permit shall be issued except upon receipt of proof of compliance with all state and county water and sewage rules and regulations.