A.
Applications for permits under this chapter shall be made in writing to the Township Engineer on a form to be supplied by the Township and shall describe the location of the intended excavation, opening, tunnel, monitoring wells or obstruction, the size and the purpose therefor, the time within which such work shall be completed, the person doing the actual excavating or obstructing work, the person for whom the work is being done and the person who will restore the permanent pavement when the same is not to be done by the applicant.
[Amended 3-20-2017 by Ord. No. 17-06]
B.
The application shall be accompanied by a diagram indicating the nature and extent of the excavation, opening, tunnel, monitoring wells or obstruction. If during the course of the work any variation is required, the applicant shall file with the Township Engineer an amended diagram showing the manner in which the work is actually being done.
[Amended 3-20-2017 by Ord. No. 17-06]
D.
The permit shall be signed by the owner/occupant of the abutting property, as well as the agent(s) conducting any proposed construction (if different from the owner/occupant), and approved by the Township Engineer.