[Ord. 7-2005, 7/13/2005]
The developer or builder shall be required to furnish a bond and to pay the following fees and costs:
A.
The Borough filing fee.
B.
The Montgomery County Planning Commission review fee.
C.
Planning and Engineering Services. The services of the Borough Planner, Borough Engineer as provided in these rules and regulations, including plan review and inspection. In addition, all costs for other engineering and professional certification as deemed necessary.
D.
Material and Facilities Tests. The actual cost of all drainage, water and/or material tests.
E.
Dedication. Legal fees, advertising and other costs involved in the dedication of streets and public improvements to the Borough.