During any stage of the work, if the Township, Township Engineer
or their designee determines that the permanent stormwater management
facilities are not being installed in accordance with the approved
SWM site plan, the Township may revoke any existing building permits
and issue a cease-and-desist order until a revised SWM site plan is
submitted and approved except as directed by the Township or Conservation
District, as specified in this chapter.