As used in this chapter, the following terms shall have the meanings indicated:
ADMINISTERING AUTHORITYA governmental employee that is designated by the Lodi Common Council to administer this chapter.
BEST MANAGEMENT PRACTICE or BMPStructural or nonstructural measures, practices, techniques or devices employed to avoid or minimize soil, sediment or pollutants carried in runoff to waters of the state.
BUSINESS DAYA day the City Hall is routinely and customarily open for business.
CEASE AND DESIST ORDERA court-issued order to halt land-disturbing construction activity that is being conducted without the required permit.
CONSTRUCTION SITEAn area upon which one or more land-disturbing construction activities occur, including areas that are part of a larger common plan of development or sale where multiple separate and distinct land-disturbing construction activities may be taking place at different times on different schedules but under one plan.
DIVISION OF LANDA division of a lot or parcel of land for the purpose of transfer of ownership or of building development where the act of division creates from one parcel five or more parcels or building sites of 1.5 or fewer acres each in area where such creation occurs at one time or through the successive partition within a five-year period.
EROSIONThe process by which the land's surface is worn away by the action of wind, water, ice or gravity.
EROSION AND SEDIMENT CONTROL PLANA comprehensive plan developed to address pollution caused by erosion and sedimentation of soil particles or rock fragments during construction.
EXTRATERRITORIALThe unincorporated area within 1.5 miles of the municipal boundaries of the City of Lodi.
FINAL STABILIZATIONAll land-disturbing construction activities at the construction site have been completed and that a uniform perennial vegetative cover has been established, with a density of at least 70% of the cover, for the unpaved areas and areas not covered by permanent structures, or that employ equivalent permanent stabilization measures.
LAND-DISTURBING CONSTRUCTION ACTIVITYAny man-made alteration of the land surface resulting in a change in the topography or existing vegetative or nonvegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land-disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.
MEP or MAXIMUM EXTENT PRACTICABLEA level of implementing best management practices in order to achieve a performance standard specified in this chapter which takes into account the best available technology, cost effectiveness and other competing issues such as human safety and welfare, endangered and threatened resources, historic properties and geographic features. MEP allows flexibility in the way to meet the performance standards and may vary based on the performance standard and site conditions.
PERFORMANCE STANDARDA narrative or measurable number specifying the minimum acceptable outcome for a facility or practice.
PERMITA written authorization made by the Building Inspector to the applicant to conduct land-disturbing construction activity or to discharge post-construction runoff to waters of the state.
RESPONSIBLE PARTYAny entity holding fee title to the property or performing services to meet the performance standards of this chapter through a contract or other agreement.
RUNOFFStormwater or precipitation, including rain, snow or ice melt or similar water, that moves on the land surface via sheet or channelized flow.
SEDIMENTSettleable solid material that is transported by runoff, suspended within runoff or deposited by runoff away from its original location.
SEPARATE STORM SEWERA conveyance or system of conveyances, including roads with drainage systems, streets, catch basins, curbs, gutters, ditches, constructed channels or storm drains, which meets all of the following criteria:
A. Is designed or used for collecting water or conveying runoff.
B. Is not part of a combined sewer system.
C. Is not draining to a stormwater treatment device or system.
D. Discharges directly or indirectly to waters of the state.
SITEThe entire area included in the legal description of the land on which the land-disturbing construction activity is proposed in the permit application.
STOP-WORK ORDERAn order issued by the Building Inspector which requires that all construction activity on the site be stopped.
TECHNICAL STANDARDA document that specifies design, predicted performance and operation and maintenance specifications for a material, device or method.