The following fee schedule is adopted to be effective as to those applications filed hereafter:
A.
Planning Board review fees.
(1)
Subdivisions: $650 per lot.
[Amended 1-10-1995; 8-18-2010 by L.L. No. 3-2010]
(2)
Site plans.
[Added 8-13-1991; amended 10-12-1993 by L.L. No. 5-1993; 1-10-1995; 8-18-2010 by L.L. No. 3-2010]
(3)
Inspection fees.
[Amended 7-14-1987; 10-12-1993 by L.L. No. 5-1993]
(a)
Inspection fees for new roads or other improvements within any subdivision prior to the signing of the plat by the Chairman of the Planning Board shall be 4% of the total project performance bond as established by the Town Board, regardless of whether it is proposed to construct a portion of the improvements prior to the signing of the plat or whether the project is proposed to be constructed in phases.
[Amended 3-20-2000 by L.L. No. 1-2000]
(b)
If the project is proposed to be bonded and/or constructed in phases, the inspection fee for each phase shall be that fraction of the total inspection fee as determined above that represents the fraction of the proposed phase's construction cost to the total project's construction cost.
(4)
Lot line realignment: $400.
[Added 1-10-1995]