No person other than a person authorized by the Borough shall
uncover, make any connection with or opening into, use, repair, alter
or disturb any public sewer or building sewer lateral and the appurtenances
thereof.
[Amended 6-22-1971 by Ord. No. 696; 8-19-2003 by Ord. No. 03-12]
A. If no building sewer lateral is available, the property owner shall,
prior to the issuance of a certificate of occupancy, apply to the
Borough Clerk to have a building sewer lateral installed. The applicant
shall be responsible for all costs in connection with the installation
of the sewer lateral, including those costs and expenses of the Borough,
such as the fees charged by the Sewer Engineer or such other official
or department as the Borough shall designate who shall have the duty
to supervise the installation of the lateral. No certificate of occupancy
shall be finally issued to the applicant until the sewer lateral has
been installed to the satisfaction of the Sewer Engineer or such other
official or department as shall have the responsibility of approving
the installation and the fee for a sewer connection as hereinafter
set forth has been paid to the Borough Clerk.
B. Where a sewer lateral has been installed to the satisfaction of the
Sewer Engineer or other official or department as the Borough shall
designate who shall have the duty to supervise the installation of
the lateral, and the work and the property which abuts the sewer has
been assessed for the installation of the sewer, an inspection fee
in the sum set out in the Westwood Fee Ordinance shall be payable to the Borough Clerk at the time a building
sewer permit is issued for the connection of a building or structure
to the sewer system of the Borough.
C. Where a sewer lateral has been installed to the satisfaction of the
Sewer Engineer or other official or department as the Borough shall
designate who shall have the duty to supervise the installation of
the lateral, and no assessment has been made for the construction
of the sewer abutting the property, there shall be a sewer connection
fee in the sum set out in the Westwood Fee Ordinance which shall be payable to the Borough Clerk at the time
a building sewer permit is issued for the connection of a building
or structure to the sewer system of the Borough.
Maintenance of the public sewer and building sewer laterals,
all connections to the public sewer and all work performed on the
sewer system between the main and the property line, including the
installation of building sewer laterals, shall be performed by the
Department of Public Works or other person authorized by the Borough.
Any person so authorized, other than a Borough employee, shall be
required to post a performance guaranty in the amount of 125% of the
Sewer Engineer's estimate of the cost. Said performance guaranty
shall be in such form as the Borough shall prescribe.