A.
There is hereby charged and imposed upon the owner of each connection unit a connection charge which shall be due and payable to the Township:
(1)
With respect to those owners who are required to connect to a sewer by ordinance of the Township, at the time the connection permit is issued or 60 days after written notice to such owner to connect, whichever date is earlier; and
B.
The owner of each property required to be connected to the sewer system and the owner of each property who shall voluntarily connect such property with the sewer system, although not required to do so, shall pay the following charges to the Township:
[Amended 6-9-2021 by Ord. No. 2021-05]
C.
Properties for which no lateral is provided. The owner of each property for which no lateral is provided at the time of the installation of the sewer and who thereafter shall be required to connect or shall voluntarily connect to a sewer of the sewer system having a diameter of eight inches or greater shall pay a deposit of $600, which shall be used toward the actual cost to the Township of constructing the lateral. Any additional costs shall be paid within 30 days after completion. If the cost is less than $600, the amount not used shall be refunded. Owner shall also pay a connection charge, and such charge shall be due and payable in accordance with the provisions of the first subsection of this section, subject to adjustment upon completion of the work.